I applied via Referral and was interviewed before Apr 2022. There were 3 interview rounds.
Regarding to cycle time for sizes of materials and printing impressions
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.
Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.
Production cost includes expenses related to labor, energy, and maintenance of machinery.
Overhead expenses include costs related to administration, marketing, and distributi...
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 25 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Tool Maker
26
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Production Engineer
25
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Production Supervisor
12
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Design Engineer
10
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Assistant Manager
9
salaries
| ₹4.3 L/yr - ₹8.5 L/yr |
Uflex
Huhtamaki
EPL Limited
Manjushree Technopack