Filter interviews by
I applied via Naukri.com and was interviewed in May 2020. There were 3 interview rounds.
Top trending discussions
Online Aptitude test
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can impl...
posted on 26 Oct 2024
I was interviewed before Oct 2023.
posted on 16 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2021. There were 3 interview rounds.
Fine tuning a program involves identifying and addressing any issues or inefficiencies to optimize performance.
Analyze program performance metrics
Identify areas for improvement
Adjust code or settings to optimize performance
Test changes to ensure they improve performance
Repeat process as necessary
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
IATF clauses refer to specific requirements outlined in the International Automotive Task Force standards for automotive quality management systems.
IATF clauses are essential components of the quality management system for automotive companies.
They outline specific requirements that must be met in order to achieve IATF certification.
Examples of IATF clauses include requirements for leadership commitment, risk managemen...
M codes and G codes are commands used in CNC machines to control various functions and operations.
M codes are used for miscellaneous functions like stopping the machine or changing tools.
G codes are used for specific movements and operations like cutting, drilling, or milling.
Examples of M codes: M00 (program stop), M06 (tool change), M30 (end of program)
Examples of G codes: G00 (rapid positioning), G01 (linear interpo
I was interviewed before Feb 2023.
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure suppliers meet quality requirements.
PPAP is a set of documents and requirements that must be submitted by suppliers to demonstrate their ability to meet customer specifications.
Elements in PPAP checklist include: design records, engineering change documents, process flow diagram, control plan, measurement...
based on 4 reviews
Rating in categories
Assistant Manager
15
salaries
| ₹10.3 L/yr - ₹13 L/yr |
Design Engineer
12
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Senior Engineer
11
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Manager
8
salaries
| ₹14 L/yr - ₹19.5 L/yr |
Senior Manager
8
salaries
| ₹25 L/yr - ₹30 L/yr |
Thermax Limited
Kirloskar Brothers
BHEL
Larsen & Toubro Limited