Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 429 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all
Manager – Electrical
4 salaries
unlock blur

₹12 L/yr - ₹14 L/yr

Construction Management
3 salaries
unlock blur

₹13.5 L/yr - ₹13.5 L/yr

Planning Engineer
3 salaries
unlock blur

₹4.6 L/yr - ₹5 L/yr

Quantity Surveyor
3 salaries
unlock blur

₹7.7 L/yr - ₹10 L/yr

Construction Manager Civil
3 salaries
unlock blur

₹13.5 L/yr - ₹13.5 L/yr

Explore more salaries
Compare Megawide Construction Corporation with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview