Filter interviews by
I applied via campus placement at Arya Institute of Engineering & Technology, Jaipur and was interviewed in Jun 2021. There were 3 interview rounds.
Top trending discussions
I was interviewed in Dec 2024.
Technical aptitude related to wiring, symbol identify, software related
posted on 20 Jan 2021
The formula for cross section of earthing conductor and depth of burying the strip or bare earthing conductor.
The formula for cross section of earthing conductor is determined by the maximum fault current and the allowable touch voltage.
The depth of burying the strip or bare earthing conductor depends on factors such as soil resistivity and the type of installation.
The cross section of earthing conductor can be calcula...
De-rating factors and considerations for cable sizing calculations in electrical engineering.
De-rating factors include ambient temperature, grouping, soil thermal resistivity, and cable installation method.
Ambient temperature affects the cable's current carrying capacity.
Grouping of cables can lead to increased heat generation and reduced current carrying capacity.
Soil thermal resistivity affects the heat dissipation c...
I was interviewed in Dec 2024.
Technical aptitude related to wiring, symbol identify, software related
posted on 21 Sep 2024
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
I have worked on various instruments including multimeters, oscilloscopes, power analyzers, and calibration equipment.
Multimeters
Oscilloscopes
Power analyzers
Calibration equipment
I am looking for a competitive salary that reflects my experience and skills in the electrical field.
Research average salaries for Electrical Supervisors in the industry
Consider your level of experience and qualifications
Factor in the location and size of the company
Be prepared to negotiate based on benefits and opportunities for growth
posted on 20 Jan 2021
The formula for cross section of earthing conductor and depth of burying the strip or bare earthing conductor.
The formula for cross section of earthing conductor is determined by the maximum fault current and the allowable touch voltage.
The depth of burying the strip or bare earthing conductor depends on factors such as soil resistivity and the type of installation.
The cross section of earthing conductor can be calcula...
De-rating factors and considerations for cable sizing calculations in electrical engineering.
De-rating factors include ambient temperature, grouping, soil thermal resistivity, and cable installation method.
Ambient temperature affects the cable's current carrying capacity.
Grouping of cables can lead to increased heat generation and reduced current carrying capacity.
Soil thermal resistivity affects the heat dissipation c...
Assistant Manager
9
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Supervisor
6
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Production Engineer
6
salaries
| ₹2 L/yr - ₹2.7 L/yr |
Senior Engineer
5
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
Assistant Store Manager
5
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Siemens
ABB
Schneider Electric
Havells