Filter interviews by
Handling pressure during work load requires effective time management, prioritization, delegation, and stress management techniques.
Create a to-do list and prioritize tasks based on urgency and importance
Delegate tasks to team members if possible
Take breaks and practice stress management techniques such as deep breathing or meditation
Communicate with colleagues and managers about workload and seek support if needed
Main...
Top trending discussions
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
Verbal, logical and communication aptitude test.
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
The list count of vernier caliper is 20.
Vernier caliper has two scales - main scale and vernier scale.
The main scale has 10 divisions, each division is 1 mm.
The vernier scale has 9 divisions, each division is 0.9 mm.
The list count is the number of smallest divisions on the vernier scale that coincide with a division on the main scale.
In case of vernier caliper, the list count is 20.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. 5M is a method for improving workplace safety and efficiency. KPI stands for Key Performance Indicator.
5S focuses on organizing the workplace to improve efficiency and reduce waste.
5M stands for Man, Machine, Material, Method, and Measurement and is used to identify areas for improvement in workp...
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.
I have a strong background in production engineering and a proven track record of improving efficiency and reducing costs.
I have a Bachelor's degree in Production Engineering and have completed internships at two leading manufacturing companies.
I have successfully implemented process improvements that resulted in a 20% increase in production output at my previous job.
I am skilled in using various production software an...
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
Tolerance refers to the acceptable range of variation in a physical dimension or property of a material or product.
Tolerance is the difference between the maximum and minimum limits of a dimension or property.
It ensures that parts fit together properly and function as intended.
Tolerance can be specified as a numerical value or a range, such as +/- 0.1mm.
Examples include the tolerance for the diameter of a shaft or the
The least count of a micrometer is the smallest measurement that can be read on the scale.
The least count of a micrometer is typically 0.01mm or 0.001mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the main scale.
For example, a micrometer with 50 divisions on the thimble and a main scale reading in mm will have a least count of 0.01mm.
A jig is a type of tool used to control the location and/or motion of another tool. A fixture is a work-holding or support device used in the manufacturing industry.
Jigs are used to guide cutting tools, while fixtures are used to hold workpieces in place during machining operations.
Jigs and fixtures are commonly used in manufacturing processes such as welding, drilling, and milling.
Examples of jigs include drill jigs, ...
based on 3 reviews
Rating in categories
Senior Design Engineer
151
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Design Engineer
139
salaries
| ₹2.4 L/yr - ₹12 L/yr |
Lead Engineer
135
salaries
| ₹7.8 L/yr - ₹21 L/yr |
Software Engineer
115
salaries
| ₹5 L/yr - ₹13 L/yr |
Engineer
107
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Bosch
Yazaki
Faurecia
Valeo