Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2019. There was 1 interview round.
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing workflow.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish procedures and guidelines for maintaining the 5S system
Sustain - ensure that the 5S system i...
Poka-yoke is a Japanese term for mistake-proofing. It is a technique used to prevent errors in a process.
There are two types of Poka-yoke: prevention and detection
Prevention Poka-yoke aims to prevent errors from occurring in the first place
Detection Poka-yoke aims to detect errors that have already occurred
Examples of Poka-yoke include using jigs to ensure parts are assembled correctly and using sensors to detect error
TPM stands for Total Productive Maintenance. My role in TPM activity is to ensure that all equipment and machinery are functioning at their optimal level to minimize downtime and increase productivity.
TPM is a maintenance strategy that aims to maximize the efficiency and effectiveness of equipment and machinery
It involves regular maintenance, cleaning, and inspection of equipment to prevent breakdowns and reduce downti...
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identifying and preventing potential failures in a process, product or service.
It involves identifying potential failure modes, determining their effects and likelihood, and taking steps to mitigate or eliminate them.
FMEA is commonly used in industries such as manufacturing, healthcare, and aerospace.
It can help improve product quality, re...
Top trending discussions
posted on 24 Jan 2025
posted on 19 Mar 2024
I was interviewed before Jan 2024.
Basic Reasoning and GK questions
You have solve a puzzle before starting your further interviews
posted on 22 Nov 2023
Work responsibility,role,personal details,education,technical knowledge
posted on 1 Dec 2022
I applied via Referral and was interviewed in Nov 2022. There were 4 interview rounds.
posted on 29 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There were 2 interview rounds.
Environment Dicuss India
India Environment Solution Dicuss
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
To maintain a plant, regular inspections, preventive maintenance, and efficient resource management are essential.
Perform regular inspections to identify any issues or potential problems.
Implement a preventive maintenance program to address maintenance needs before they become major issues.
Ensure efficient resource management by optimizing production processes and minimizing waste.
Train and educate plant staff on prope...
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
The temperature of a heat exchanger can vary depending on the specific design and operating conditions.
The temperature of a heat exchanger is typically monitored and controlled to optimize efficiency and performance.
The temperature can range from ambient temperature to several hundred degrees Celsius, depending on the application.
Factors such as flow rate, fluid properties, and heat transfer surface area can all affect
VLS stands for Very Large Scale Integration.
VLS refers to the process of creating integrated circuits by combining thousands of transistors on a single chip.
Examples of VLS include microprocessors, memory chips, and application-specific integrated circuits (ASICs).
Design Engineer
8
salaries
| ₹2 L/yr - ₹3 L/yr |
Quality Executive
5
salaries
| ₹3.3 L/yr - ₹3.6 L/yr |
Sr.Maintenance Executive
5
salaries
| ₹3.5 L/yr - ₹3.6 L/yr |
Assistant Manager
4
salaries
| ₹3.5 L/yr - ₹8.7 L/yr |
Plant Head
4
salaries
| ₹8 L/yr - ₹8.6 L/yr |
Ecozen Solutions
Ecolibrium Energy
Eco Recycling
Ecofirst Services