Yes, electrical load calculation is the process of determining the amount of power that a building or electrical system requires.
Electrical load calculation involves considering the power requirements of various electrical devices and appliances in a building or system.
Factors such as voltage, current, and power factor are taken into account during the calculation.
Load calculation helps in determining the appropriate s...
Developed a new power distribution system for a large manufacturing plant, resulting in a 20% increase in efficiency.
Designed and implemented a new power distribution system for a large manufacturing plant
Collaborated with a team of engineers and technicians to ensure successful installation and operation
Resulted in a 20% increase in efficiency and significant cost savings for the company
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
posted on 16 Oct 2022
High voltage working involves handling electrical systems with voltages above a certain threshold.
High voltage working requires specialized knowledge and training to ensure safety.
Proper personal protective equipment (PPE) should be worn when working with high voltage.
Strict adherence to safety protocols and procedures is crucial to prevent accidents and injuries.
Examples of high voltage systems include power transmiss...
A power transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Power transformers are used to step up or step down voltage levels in electrical power transmission and distribution systems.
They consist of a primary winding, a secondary winding, and a magnetic core.
When an alternating current flows through the primary winding, it creates a magne...
I applied via LinkedIn and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Aug 2021. There was 1 interview round.
I will isolate the transformer and investigate the cause of the differential trip.
Isolate the transformer from the system
Check the differential relay settings and wiring
Inspect the transformer for any physical damage or oil leaks
Check the oil level and quality
Investigate the cause of the differential trip
Take corrective actions to prevent future trips
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
posted on 27 Apr 2022
I applied via Newspaper Ad and was interviewed before Apr 2021. There was 1 interview round.
PLC is a programmable logic controller used for automation. SCADA is a supervisory control and data acquisition system. Induction motor is an AC motor.
PLC is used to control industrial processes and machines.
SCADA is used to monitor and control large-scale processes and systems.
Induction motor is a type of AC motor commonly used in industrial applications.
PLC and SCADA are often used together in industrial automation.
I...
based on 1 review
Rating in categories
Junior Engineer
85
salaries
| ₹2.7 L/yr - ₹5 L/yr |
Assistant Manager
55
salaries
| ₹4.9 L/yr - ₹11.5 L/yr |
Engineer
51
salaries
| ₹3.1 L/yr - ₹6.2 L/yr |
Senior Engineer
49
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Service Engineer
37
salaries
| ₹2 L/yr - ₹6 L/yr |
Sterling & Wilson
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner