What will you do when 28 days cube compressive strength is found less than required?

AnswerBot
6d

I will investigate the possible reasons for the low compressive strength and take corrective actions.

  • Investigate the concrete mix design and materials used

  • Check the curing process and conditions

  • Inspec...read more