What are the pre initiative action for start pilling
AnswerBot
1y
Pre-initiative actions for start piling
Conduct a geotechnical investigation to assess soil conditions
Obtain necessary permits and approvals from local authorities
Develop a detailed piling plan and sch...read more
Anonymous
author
2y
Soil levelling,see the soil conditions before placing the rig, identify the drain area for flushing.Take the point from surveyer,dig manually upto atleast 300 mm.