Rheinmetall Automotive
10+ BHAGWAN RAM CHARITABLE HOSPITAL Interview Questions and Answers
Q1. What methods can be used to improve the power factor of a 130 kW load with a power factor of 0.7, and what rating of capacitor is required for this improvement?
To improve the power factor of a 130 kW load with a power factor of 0.7, capacitors can be used. The required rating of the capacitor depends on the desired power factor improvement.
Install capacitors in parallel with the load to improve power factor
Calculate the required capacitance using the formula: C = (P * tan(acos(pf))) / (V^2)
Choose capacitors with the appropriate voltage and capacitance rating for the load
Ensure proper installation and maintenance of the capacitors to...read more
Q2. What is eddy current What is 5s tpm What is electromagnetic induction What formula of rpm measurement How dc motor work How you daily shift handover takeover How deal with major breakdown How star delta starter...
read moreQuestions related to maintenance engineering including eddy current, 5S TPM, electromagnetic induction, RPM measurement, DC motor, shift handover, major breakdown, and star delta starter.
Eddy current is a current induced in a conductor due to a changing magnetic field
5S TPM is a methodology for workplace organization and standardization
Electromagnetic induction is the production of an electromotive force across a conductor due to a changing magnetic field
RPM measurement can b...read more
Q3. How to use third party device in plc what is process?
To use a third party device in a PLC, you need to establish communication protocols and configure the PLC to send and receive data from the device.
Identify the communication protocol supported by the third party device (e.g. Modbus, Profibus)
Configure the PLC to communicate with the third party device using the identified protocol
Map the data points between the PLC and the third party device to ensure seamless data exchange
Test the communication to ensure proper functionality...read more
Q4. 5S properly neet and clean who to improve??
To improve 5S, proper training, regular audits, and continuous improvement initiatives are necessary.
Provide training to employees on 5S principles and techniques.
Conduct regular audits to identify areas for improvement and ensure compliance.
Implement continuous improvement initiatives to sustain 5S practices.
Encourage employee participation and ownership in maintaining a clean and organized workplace.
Use visual management tools such as signage and color coding to support 5S ...read more
Q5. What is star delta starter?
Star delta starter is a type of reduced voltage starter used in induction motors to reduce starting current.
Consists of two contactors - one for star connection and one for delta connection
Initially motor is started in star connection to reduce starting current
After a set time, motor is switched to delta connection for full speed operation
Used in applications where high starting current can damage equipment
Q6. What is eddy current formula?
The eddy current formula calculates the magnitude of induced currents in a conductor due to a changing magnetic field.
The formula is given by: I = π * D * f * B * σ
Where I is the eddy current (A)
D is the diameter of the coil (m)
f is the frequency of the magnetic field (Hz)
B is the magnetic field strength (T)
σ is the conductivity of the material (S/m)
Q7. How to chose number of frequencies?
The number of frequencies should be chosen based on the complexity of the model and the desired level of accuracy.
Consider the size and complexity of the model - more frequencies may be needed for intricate geometries
Balance between computational time and accuracy - higher number of frequencies increases computation time
Perform convergence studies to determine the minimum number of frequencies required for accurate results
Q8. What is purchase to payment cycle
The purchase to payment cycle refers to the process of purchasing goods or services and making the corresponding payment.
It starts with identifying the need for a product or service.
The next step is to create a purchase order and send it to the supplier.
Upon receiving the goods or services, the invoice is generated.
The invoice is then matched with the purchase order and goods receipt.
Once the invoice is approved, the payment is made to the supplier.
Finally, the payment is rec...read more
Q9. What is modal analysis?
Modal analysis is a technique used to study the dynamic behavior of structures by identifying their natural frequencies and mode shapes.
Modal analysis helps in understanding how a structure will respond to dynamic loads.
It involves calculating the natural frequencies and mode shapes of a structure.
Modal analysis is commonly used in structural engineering, aerospace engineering, and mechanical engineering.
The results of modal analysis can be used to optimize the design of stru...read more
Q10. What is purchase order
A purchase order is a document issued by a buyer to a seller, indicating the types, quantities, and agreed prices for products or services.
It is a formal request to purchase goods or services
It includes details such as item descriptions, quantities, prices, and delivery dates
It serves as a legally binding contract between the buyer and seller
It helps in tracking and managing inventory and expenses
Example: A company sends a purchase order to a supplier to order 100 units of a ...read more
Q11. What is subcontracting
Subcontracting is the practice of hiring another company or individual to perform specific tasks or services on behalf of the main contractor.
Subcontracting involves outsourcing certain tasks or services to a third party.
The subcontractor is responsible for completing the assigned work according to the terms of the contract.
Subcontracting can be used in various industries, such as construction, manufacturing, and IT.
Examples of subcontracting include hiring a cleaning company...read more
Q12. Why you think KSPG will be better option
KSPG offers a challenging work environment with opportunities for growth and development.
KSPG has a strong reputation in the industry
The company values innovation and encourages employees to think outside the box
There are opportunities for career advancement and professional development
KSPG has a diverse and inclusive workplace culture
The company offers competitive compensation and benefits packages
Q13. Which factors affecting MSA study
Factors affecting MSA study
Measurement system stability
Measurement system bias
Measurement system linearity
Measurement system repeatability
Measurement system reproducibility
Measurement system accuracy
Measurement system precision
Measurement system resolution
Measurement system sensitivity
Measurement system robustness
Top HR Questions asked in BHAGWAN RAM CHARITABLE HOSPITAL
Interview Process at BHAGWAN RAM CHARITABLE HOSPITAL
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month