Upload Button Icon Add office photos

Jsw Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Jsw Infrastructure Network Engineer L1 Interview Questions and Answers

Updated 1 Apr 2023

Jsw Infrastructure Network Engineer L1 Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for Jsw Infrastructure Network Engineer L1 interview:
  • CCNA
  • Windows Server
Interview preparation tips for other job seekers - Througly prepare for all network protocols and basic of ccna

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Make your conversation skills very strong

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Given reply with basic
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Contribute & help others!
anonymous
You can choose to be anonymous

Jsw Infrastructure Interview FAQs

How many rounds are there in Jsw Infrastructure Network Engineer L1 interview?
Jsw Infrastructure interview process usually has 2 rounds. The most common rounds in the Jsw Infrastructure interview process are Resume Shortlist and Technical.
What are the top questions asked in Jsw Infrastructure Network Engineer L1 interview?

Some of the top questions asked at the Jsw Infrastructure Network Engineer L1 interview -

  1. What is dnsb server and what is the wor...read more
  2. What is md5 hash and how to use ...read more

Recently Viewed

INTERVIEWS

Daffodil Software

No Interviews

REVIEWS

Daffodil Software

No Reviews

INTERVIEWS

Sany Heavy Industry

No Interviews

INTERVIEWS

Jsw Infrastructure

No Interviews

INTERVIEWS

Sany Heavy Industry

No Interviews

INTERVIEWS

Daffodil Software

No Interviews

INTERVIEWS

Jsw Infrastructure

No Interviews

INTERVIEWS

Sany Heavy Industry

No Interviews

SALARIES

Lanco Infratech

INTERVIEWS

Jsw Infrastructure

No Interviews

Tell us how to improve this page.

Jsw Infrastructure Network Engineer L1 Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
View all
Assistant Manager
49 salaries
unlock blur

₹5.8 L/yr - ₹12 L/yr

Deputy Manager
27 salaries
unlock blur

₹7.8 L/yr - ₹16.9 L/yr

Junior Manager
18 salaries
unlock blur

₹4.7 L/yr - ₹7.6 L/yr

Manager
10 salaries
unlock blur

₹11.2 L/yr - ₹20.5 L/yr

Senior Engineer
8 salaries
unlock blur

₹7.2 L/yr - ₹9.9 L/yr

Explore more salaries
Compare Jsw Infrastructure with

Adani Ports and SEZ

3.8
Compare

GMR Group

4.0
Compare

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview