Filter interviews by
Clear (1)
I was interviewed before Jun 2023.
Top trending discussions
Fault level is the maximum current that can flow through a power system during a fault.
Fault level is a measure of the system's ability to handle fault currents.
It is important to calculate fault level to ensure the safety and reliability of the power system.
Fault level can be calculated by considering the impedance of the system and the available fault current sources.
The calculation involves determining the maximum f...
I would assess the situation, prioritize based on urgency and impact on operations, and make a fair decision considering the needs of the team and the business.
Assess the reasons for leave requests - urgent personal matters, planned vacations, etc.
Prioritize based on urgency and impact on operations - critical tasks, team workload, upcoming deadlines.
Consider alternative solutions - shifting schedules, temporary replac...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Job Portal and was interviewed in Nov 2021. There was 1 interview round.
Solar refers to the energy that is harnessed from the sun and converted into usable electricity.
Solar energy is renewable and sustainable
It is generated through the use of solar panels
Solar power can be used for residential, commercial, and industrial purposes
Solar energy is a clean source of energy that does not produce harmful emissions
Countries like Germany, China, and the United States are leading producers of sola
Basic Knowledge only
I applied via Walk-in
Alumina is manufactured through the Bayer process, which involves extracting aluminum oxide from bauxite ore.
Bauxite ore is crushed and mixed with sodium hydroxide to form a slurry
The slurry is heated and pressurized to dissolve the aluminum oxide
The resulting solution is cooled and filtered to remove impurities
The aluminum oxide is then heated at high temperatures to form alumina
The temperature required for this proce
I was interviewed before Mar 2022.
I applied via Campus Placement and was interviewed before Dec 2021. There were 3 interview rounds.
Normal test with some basic questions
Productivity is the measure of how efficiently resources are used to achieve desired outcomes.
Productivity is a measure of output per unit of input.
It indicates how effectively resources such as time, labor, and capital are utilized.
Higher productivity means achieving more with the same or fewer resources.
For example, if a factory produces 100 units in an hour with 10 workers, and then increases productivity to produce...
Utilization refers to the percentage of time a resource is being used effectively.
It is commonly used in project management to measure the productivity of resources.
For example, if a machine is used for 8 hours out of a 10-hour shift, its utilization is 80%.
In healthcare, utilization can refer to the number of times a service or treatment is used by patients.
It can also be used to measure the efficiency of healthcare p...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
691
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
651
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
400
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel