Filter interviews by
Clear (1)
Top trending discussions
Fault level is the maximum current that can flow through a power system during a fault.
Fault level is a measure of the system's ability to handle fault currents.
It is important to calculate fault level to ensure the safety and reliability of the power system.
Fault level can be calculated by considering the impedance of the system and the available fault current sources.
The calculation involves determining the maximum f...
I would assess the situation, prioritize based on urgency and impact on operations, and make a fair decision considering the needs of the team and the business.
Assess the reasons for leave requests - urgent personal matters, planned vacations, etc.
Prioritize based on urgency and impact on operations - critical tasks, team workload, upcoming deadlines.
Consider alternative solutions - shifting schedules, temporary replac...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Job Portal and was interviewed in Nov 2021. There was 1 interview round.
Solar refers to the energy that is harnessed from the sun and converted into usable electricity.
Solar energy is renewable and sustainable
It is generated through the use of solar panels
Solar power can be used for residential, commercial, and industrial purposes
Solar energy is a clean source of energy that does not produce harmful emissions
Countries like Germany, China, and the United States are leading producers of sola
I applied via Walk-in
Alumina is manufactured through the Bayer process, which involves extracting aluminum oxide from bauxite ore.
Bauxite ore is crushed and mixed with sodium hydroxide to form a slurry
The slurry is heated and pressurized to dissolve the aluminum oxide
The resulting solution is cooled and filtered to remove impurities
The aluminum oxide is then heated at high temperatures to form alumina
The temperature required for this proce
Basic Knowledge only
I was interviewed before Mar 2022.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Capacity and capability of lines refer to the maximum output and skill level of production lines.
Capacity of lines refers to the maximum amount of output that a production line can produce within a given time frame.
Capability of lines refers to the skill level and efficiency of the production line in producing high-quality products.
Examples: Increasing the number of machines in a production line can increase its capaci...
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Junior Engineer
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
691
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
651
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
400
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel