I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some basic datails of my knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - I will be interested of boiler dcs engineer and I got a smooth operation and maintenance of boiler department.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. Boiler DCS question
  • Q2. Full form of Dcs
  • Ans. 

    DCS stands for Distributed Control System.

    • DCS is a computerized control system used to control and monitor industrial processes.

    • It consists of a network of controllers distributed throughout a plant or facility.

    • DCS allows for centralized control and monitoring of various processes and equipment.

    • It provides real-time data acquisition, control, and visualization.

    • Examples of DCS include systems used in power plants, oil r

  • Answered by AI

I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - Assignment 

Education, experience, critical condition handling, about all operations with safety

Round 2 - Technical 

(1 Question)

  • Q1. About thermal power plant, which cycles power plant works?, what is scada?, Boiler efficiency?, Types of Heat transfer?....

Interview Preparation Tips

Interview preparation tips for other job seekers - Documents, personal details, varification, etc

I applied via Naukri.com

Round 1 - One-on-one 

(2 Questions)

  • Q1. Power plant question
  • Q2. Power plant Boiler question

Interview Preparation Tips

Topics to prepare for Bravo Sponge Iron 1st class Boiler Operator interview:
  • Power Plant
Interview preparation tips for other job seekers - For power plant questiomboiler relative and mechanical relative and

Interview Questionnaire 

1 Question

  • Q1. Vmc machine

I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Boiler operation related

Interview Preparation Tips

Interview preparation tips for other job seekers - Boiler First Class attendant &mach diploma part time

Interview Questionnaire 

4 Questions

  • Q1. AFBC Start-up procedures
  • Ans. 

    AFBC start-up procedures involve several steps to ensure safe and efficient operation.

    • Inspect fuel and air supply systems

    • Check boiler water level and pressure

    • Purge furnace and flue gas passages

    • Start ID and FD fans

    • Ignite fuel and adjust air flow

    • Monitor temperature and pressure

    • Gradually increase load

  • Answered by AI
  • Q2. What are Emergencies do you faced?
  • Ans. 

    I have faced emergencies related to power outages and system failures.

    • Power outage: I have experienced situations where there was a sudden loss of power, leading to system shutdowns and the need to quickly restore power to prevent data loss or equipment damage.

    • System failure: I have encountered instances where critical systems or components failed, causing disruptions in operations. These emergencies required troublesh...

  • Answered by AI
  • Q3. Water chemistry
  • Q4. ESP isolation procedures
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience based questions
  • Q2. Shift incharge role and responsibilities etc.
Round 2 - One-on-one 

(1 Question)

  • Q1. Operation related questions like parameters, light up, synchronisation,DCS operation etc.

I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. About power plant & my experience in this field, operation, emergency situation actions, light up operation, shutdown action.....

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, and what you know tell without any fear and keep patience and listen all questions sincerely than answers....
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. Boiler DCS question
  • Q2. Full form of Dcs
  • Ans. 

    DCS stands for Distributed Control System.

    • DCS is a computerized control system used to control and monitor industrial processes.

    • It consists of a network of controllers distributed throughout a plant or facility.

    • DCS allows for centralized control and monitoring of various processes and equipment.

    • It provides real-time data acquisition, control, and visualization.

    • Examples of DCS include systems used in power plants, oil r

  • Answered by AI

Jindal Group Of Companies Interview FAQs

How many rounds are there in Jindal Group Of Companies Boiler DCS Engineer interview?
Jindal Group Of Companies interview process usually has 2 rounds. The most common rounds in the Jindal Group Of Companies interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 185 Interviews
JSW Group Interview Questions
3.9
 • 107 Interviews
Viraj Profiles Interview Questions
3.8
 • 73 Interviews
View all
Assistant Manager
24 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Manager
22 salaries
unlock blur

₹9 L/yr - ₹24 L/yr

Deputy Manager
20 salaries
unlock blur

₹7 L/yr - ₹13 L/yr

Senior Manager
12 salaries
unlock blur

₹12 L/yr - ₹32 L/yr

Associate Manager
12 salaries
unlock blur

₹8 L/yr - ₹12 L/yr

Explore more salaries
Compare Jindal Group Of Companies with

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare

Bharti Enterprises

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview