Filter interviews by
I applied via Newspaper Ad and was interviewed in Apr 2022. There were 2 interview rounds.
Aptitude contain Reasoning and technical part
Top trending discussions
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
Its all about the overview of marketing
I applied via Company Website and was interviewed before Mar 2020. There was 1 interview round.
FMEA can be used to identify and mitigate risks associated with buying land and building.
Identify potential failure modes in the buying and building process
Assess the severity, occurrence, and detectability of each failure mode
Develop and implement controls to mitigate high-risk failure modes
Continuously monitor and update the FMEA as the project progresses
Examples of failure modes could include zoning restrictions, en
SPC stands for Statistical Process Control. It is a method of quality control that uses statistical methods to monitor and control a process.
SPC involves collecting and analyzing data to identify and reduce variation in a process
It helps to ensure that a process is operating within its specified limits and producing consistent results
Examples of SPC tools include control charts, histograms, and Pareto charts
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
Take some aptitude question then take 50 marks written test.
I applied via Campus Placement and was interviewed before Apr 2020. There was 1 interview round.
There are three types of heat transfer methods: conduction, convection, and radiation.
Conduction: transfer of heat through a material without any movement of the material itself
Convection: transfer of heat through the movement of fluids or gases
Radiation: transfer of heat through electromagnetic waves
Examples: boiling water (convection), touching a hot stove (conduction), feeling the warmth of the sun (radiation)
I applied via Campus Placement and was interviewed before Sep 2021. There were 4 interview rounds.
It was Pre Placement Test. In Aptitude Test They Have Asked Basic Aptitude Questions + Technical For Screening of No. Of Students
Control systems use feedback to maintain desired outputs and adjust inputs to achieve stability and accuracy.
Control systems receive input signals and compare them to desired output signals.
Feedback is used to adjust inputs to achieve desired outputs.
Control systems can be open-loop or closed-loop.
Examples include thermostats, cruise control in cars, and autopilot systems in airplanes.
I applied via Walk-in and was interviewed in Oct 2024. There were 3 interview rounds.
Be prepared
I have worked on a project related to inventory management and I am familiar with the domains of logistics and supply chain management.
Developed an inventory management system for a retail company
Implemented features such as stock tracking, order management, and supplier management
Familiar with logistics and supply chain management concepts such as demand forecasting and procurement
Collaborated with cross-functional te
Plant Operator
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Chemist
22
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Pidilite Industries
Asian Paints
BASF
Clariant Chemicals