Filter interviews by
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
Top trending discussions
I was interviewed in Dec 2024.
Jobs can be either on role (permanent) or off role (temporary/contractual)
On role jobs are permanent positions within the company
Off role jobs are temporary or contractual positions
On role employees receive benefits like insurance, paid leave, etc.
Off role employees may not receive the same benefits as on role employees
Example: Production Engineer can be hired on role as a permanent employee or off role for a specific
The salary for a Production Engineer with 3 years of experience can vary depending on location, company size, and industry.
Salaries for Production Engineers with 3 years of experience typically range from $60,000 to $90,000 per year.
Factors such as location (urban vs rural), company size, and industry (tech, manufacturing, etc.) can impact salary levels.
Additional certifications or specialized skills can also lead to h...
posted on 15 Jun 2024
Production planning is the process of organizing resources, scheduling tasks, and coordinating activities to ensure efficient production of goods.
Involves determining what products to produce, in what quantities, and by when
Includes creating production schedules, allocating resources, and setting deadlines
Requires coordination between different departments such as procurement, manufacturing, and logistics
Utilizes tools...
MMM in manufacturing stands for Materials, Methods, and Machines.
MMM refers to the three key components in manufacturing processes: Materials, Methods, and Machines.
Materials refer to the raw materials or components used in the production process.
Methods refer to the techniques or processes used to transform materials into finished products.
Machines refer to the equipment or tools used to carry out the manufacturing pr...
posted on 13 Sep 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
To apply my knowledge and skills in production engineering to contribute to the success of the organization.
To utilize my technical expertise in optimizing production processes and improving efficiency.
To work collaboratively with cross-functional teams to troubleshoot issues and implement solutions.
To ensure quality control measures are in place to meet production goals and standards.
To continuously learn and adapt to...
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Led a team to improve production efficiency by 20% at my previous job
Yes, I am comfortable with location and willing to relocate if necessary.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 12 Feb 2024
I applied via Approached by Company
Troubleshooting involves identifying, analyzing, and solving problems in a systematic manner.
Identify the problem by gathering information and observing the issue
Analyze the possible causes of the problem using logical reasoning and data
Develop a plan to address the root cause of the issue
Implement the solution and test to ensure it resolves the problem
Document the troubleshooting process for future reference
A fishbone diagram, also known as Ishikawa diagram, is a visual tool used to analyze potential causes of a problem.
Also known as Ishikawa diagram
Used to analyze potential causes of a problem
Categories typically include people, process, environment, equipment, and materials
Cycle time is the total time taken to complete a process, while takt time is the time available to complete a process.
Cycle time includes both processing time and any wait time in between tasks
Takt time is calculated as available production time divided by customer demand
For example, if a production line has a cycle time of 10 minutes and a takt time of 5 minutes, it means the line can produce 2 units every 10 minutes
based on 2 reviews
Rating in categories
Engineer
53
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Production Supervisor
37
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Deputy Manager
26
salaries
| ₹4.3 L/yr - ₹7.2 L/yr |
Quality Engineer
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Senior Engineer
19
salaries
| ₹3 L/yr - ₹7 L/yr |
Samvardhana Motherson Group
Bharat Forge
Sundaram Clayton
Rane Group