Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There were 7 interview rounds.
How can I contribute load equally in all phases
How can I install 3 phase wiring in a room
Input installing & output installing + hlc & bypass etc
To install solar panels, you need to determine the best location, install mounting hardware, connect panels in series or parallel, and wire to an inverter.
Determine the best location for maximum sunlight exposure
Install mounting hardware securely on the roof or ground
Connect panels in series or parallel depending on system design
Wire panels to an inverter to convert DC power to AC power for use in the home
To install an AC unit, you need to properly position the unit, connect the electrical wiring, secure the unit in place, and test the system for proper functioning.
Position the AC unit in a suitable location with proper ventilation and access to electrical outlets.
Connect the electrical wiring following the manufacturer's instructions and local building codes.
Secure the unit in place using mounting brackets or other app...
Installation of wiring circuit breaker system involves proper planning, wiring layout, breaker selection, and testing.
Plan the layout of the wiring circuit breaker system to ensure proper distribution of power.
Select appropriate breakers based on the electrical load requirements of the circuits.
Properly wire the circuit breaker system following electrical codes and safety standards.
Test the circuit breaker system to en...
To install Rccb, follow these steps: turn off power supply, remove cover, connect wires, secure Rccb, and test functionality.
Turn off the power supply before starting the installation process.
Remove the cover of the electrical panel to access the wiring.
Connect the wires to the appropriate terminals on the Rccb.
Secure the Rccb in place using screws or mounting brackets.
Test the functionality of the Rccb to ensure it is
To install MSU, follow these steps carefully.
Ensure the power is turned off before starting the installation process
Locate the mounting location for the MSU
Securely mount the MSU using appropriate hardware
Connect the electrical wiring following the manufacturer's instructions
Test the MSU to ensure it is functioning properly
Top trending discussions
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
I am an experienced Senior Electrician with a strong background in electrical systems and maintenance.
Over 10 years of experience in the electrical field
Extensive knowledge of electrical systems, wiring, and troubleshooting
Proficient in reading and interpreting electrical blueprints and schematics
Skilled in installing, repairing, and maintaining electrical equipment
Strong attention to detail and adherence to safety pro...
Interview experience
American Express
Taj Hotels Resorts and Palaces
Mahindra Holidays & Resorts
Radisson Hotels