Filter interviews by
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Top trending discussions
I was interviewed before May 2023.
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 4 interview rounds.
Personality, Good communication skill required
SPC, CP&CPK, CAPA, 7QC TOOL, Basic of GD&T are quality control tools used in manufacturing and engineering.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operates within its specified limits.
CP (Process Capability) and CPK (Process Capability Index) are measures of a process's ability to produce parts within specification limits.
CAPA (Corrective and Preventive Action)...
MSA is Measurement System Analysis, Kaizen is continuous improvement, Why-Why analysis is a root cause analysis technique.
MSA is used to evaluate the measurement system's ability to accurately and precisely measure a product or process.
Kaizen is a Japanese term for continuous improvement, it involves making small incremental changes to improve efficiency and quality.
Why-Why analysis is a root cause analysis technique u...
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Job Portal and was interviewed in May 2023. There were 3 interview rounds.
About your qualification and knowledge.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Company Website and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
PPAP stands for Production Part Approval Process.
PPAP is a standardized process used in the automotive industry to ensure that suppliers meet the requirements for production parts.
It involves a series of documentation and approval steps to demonstrate that the supplier's manufacturing process is capable of consistently producing parts that meet the customer's specifications.
PPAP includes elements such as design records...
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing processes.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize involves c...
Calibration instrument is a process of removing errors between instruments and providing NABL certificate.
Calibration is the process of adjusting an instrument to provide accurate results.
It involves comparing the readings of the instrument with a known standard.
The errors are then removed by adjusting the instrument accordingly.
NABL (National Accreditation Board for Testing and Calibration Laboratories) certificate is...
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
Junior Engineer
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Mechanical Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Lancer Fab Tech
Ashna Enterprise
Mold-Tek Technologies
Tooltech Global Engineering