Q1. What is the process for processing the extra items and what methods we used to follow while processing the extra items in an Infra project ?
The process for processing extra items in an Infra project involves identification, documentation, approval, and payment.
Identify the extra items that were not originally included in the project scope
Document the extra items with detailed descriptions, quantities, and costs
Obtain approval from relevant stakeholders for processing the extra items
Include the extra items in the project budget and schedule for implementation
Ensure proper documentation and tracking of the extra it...read more
Q2. If the base rate of Kota is 30rs per sft then besting a procurement guy what should be the SITC rate per sft for Kota works.
The SITC rate per sft for Kota works should be calculated based on additional costs and profit margin.
Consider additional costs such as transportation, labor, overheads, and profit margin
Calculate the total cost per sft by adding the base rate of Kota with additional costs and profit margin
For example, if transportation costs are 5rs per sft and profit margin is 10%, the SITC rate per sft would be 30rs (base rate) + 5rs (transportation) + 3rs (10% profit margin) = 38rs per sf...read more
Q3. What is bid capacity and why it is required to be calculated ?
Bid capacity is the maximum amount of bids a company can submit for a project based on their financial and resource capabilities.
Bid capacity is calculated to ensure that a company can fulfill the obligations of the contract if awarded.
It is determined by assessing the financial strength, resources, and past performance of the company.
Calculating bid capacity helps in avoiding situations where a company wins multiple contracts but cannot deliver on all of them.
It also helps i...read more
Q4. Did we consider the wastage’s while handling the base rates of TMT bars/steel ?
Yes, wastage is considered while handling the base rates of TMT bars/steel.
Wastage is typically factored into the base rates of TMT bars/steel to account for material lost during handling, cutting, and shaping processes.
Contract terms may specify allowable wastage percentages and how they will be accounted for in pricing.
For example, if the base rate is $100 per ton of TMT bars and the allowable wastage is 5%, the actual price would be adjusted to reflect the expected wastage...read more
Q5. How much wastage is considered while providing the advance for base rate items like steel etc ? Or we don’t consider ? Your thoughts on this please ?
Wastage should be considered while providing advance for base rate items like steel to account for potential losses during the procurement process.
It is important to consider a certain percentage of wastage when providing advance for base rate items like steel to ensure that enough material is available for the project.
The amount of wastage to consider can vary depending on the type of material and the specific project requirements.
For example, in construction projects, it is...read more
Q6. What is FIDIC contracts.How it’s different from NEC contracts. At least 02 major points.
FIDIC contracts are standard forms of contracts used in the construction industry, while NEC contracts are a suite of contracts designed to promote collaboration and flexibility.
FIDIC contracts are more traditional and commonly used in the construction industry.
NEC contracts focus on collaboration, flexibility, and risk management.
FIDIC contracts have more detailed provisions and are often used for large-scale projects.
NEC contracts have a more user-friendly format and encour...read more
Q7. Did you have the knowledge of SAP and Ariba ?
Yes, I have knowledge of SAP and Ariba.
I have experience using SAP for procurement processes such as purchase orders and vendor management.
I am familiar with Ariba for sourcing, procurement, and contract management.
I have successfully implemented SAP and Ariba systems in previous roles to streamline procurement operations.
Q8. What is EOT & LD. How delay analysis is prepared ?
EOT stands for Extension of Time and LD stands for Liquidated Damages. Delay analysis is prepared by analyzing project schedules and identifying causes of delays.
EOT is a request for additional time to complete a project due to delays beyond the contractor's control.
LD is a penalty imposed on the contractor for failing to meet project deadlines.
Delay analysis involves reviewing project schedules, identifying critical path activities, determining causes of delays, and assessin...read more
Q9. Applicability of said contracts in Indian industry. Any customisation etc ?
Contracts in Indian industry may require customization based on local regulations and business practices.
Contracts in Indian industry need to comply with local laws and regulations.
Customization may be required to align with specific business practices in India.
Language and cultural nuances should be considered when drafting contracts for Indian companies.
Examples of customization include incorporating clauses related to GST compliance, labor laws, and dispute resolution mech...read more
Q10. Average rate for Granite for SITC ( base rate 150 per sft ) for G+6 storey commercial space.
The average rate for Granite for SITC in a G+6 storey commercial space is calculated based on the base rate of 150 per sft.
Calculate the total square footage of granite needed for the project
Multiply the total square footage by the base rate of 150 per sft to get the total cost
Divide the total cost by the total square footage to get the average rate per sft
Q11. What is the market rate of BR glass of 72mm.
The market rate of BR glass of 72mm varies depending on factors such as quality, quantity, and supplier.
Market rates can range from $5 to $20 per square foot for BR glass of 72mm.
Prices may also vary based on the brand, location, and current market demand.
Bulk purchases may result in discounts or lower prices per unit.
Q12. What’s the market date of m40 grade of concrete.
The market date of M40 grade of concrete refers to the date when the grade was introduced or became widely available in the market.
M40 grade of concrete is a high strength concrete mix with a compressive strength of 40 megapascals (MPa).
The market date of M40 grade of concrete can vary depending on the region and availability of materials.
It is important to check with local suppliers or manufacturers for the specific market date of M40 grade of concrete.
In general, higher gra...read more
Q13. Market rate/ per sft cost for Solar panels system.
Market rate for solar panels varies depending on quality, size, and location.
Market rate for solar panels can range from $0.50 to $3.50 per watt.
Cost per square foot can range from $10 to $20 for residential installations.
Commercial installations may cost $5 to $10 per watt.
Factors affecting cost include quality of panels, size of system, location, and installation complexity.
Interview Process at Seyani Brothers
Reviews
Interviews
Salaries
Users/Month