Add office photos
Employer?
Claim Account for FREE

Gas Arabian Services

4.2
based on 70 Reviews
Filter interviews by

BINDUMADHAV PHARMA Interview Questions and Answers

Updated 14 Jan 2025

Q1. 1) What is process before starting Excenger work ?

Ans.

The process before starting Exchanger work involves several steps.

  • Inspecting the exchanger for any damages or leaks

  • Checking the pressure and temperature gauges

  • Ensuring all valves and controls are in the correct position

  • Verifying that the exchanger is properly isolated from the system

  • Performing a safety check and obtaining necessary permits

  • Preparing the necessary tools and equipment for the work

  • Following proper lockout/tagout procedures

  • Communicating with other team members and...read more

View 1 answer

Q2. What is process of open any joint ?

Ans.

The process of opening any joint involves loosening the fasteners and separating the two parts of the joint.

  • Identify the type of joint and the fasteners used

  • Use appropriate tools to loosen the fasteners

  • Separate the two parts of the joint carefully

  • Inspect the joint for any damage or wear

  • Clean and lubricate the joint before reassembling

Add your answer

Q3. Explain pump and Compressor overhauling,and alignment procedure

Ans.

Pump and compressor overhauling involves disassembling, cleaning, inspecting, repairing/replacing parts, and reassembling. Alignment ensures proper functioning.

  • Disassemble pump/compressor and clean all parts

  • Inspect parts for wear and damage

  • Repair or replace damaged parts

  • Reassemble pump/compressor

  • Align pump/compressor to ensure proper functioning

  • Test pump/compressor to ensure it is working correctly

Add your answer

Q4. WHATS A HANGING LOAD. HOW TO APROACH IT AS A SAFETY OFFICER

Ans.

A hanging load refers to a suspended load that is being lifted or moved using a crane or other lifting equipment.

  • Ensure proper rigging and securing of the load to prevent it from falling or swinging uncontrollably

  • Inspect the lifting equipment regularly to ensure it is in good working condition

  • Train and educate workers on safe lifting practices and procedures

  • Use tag lines or guide ropes to control the movement of the load during lifting operations

Add your answer
Discover BINDUMADHAV PHARMA interview dos and don'ts from real experiences

Q5. Explain Turbine overhauling and pm work

Ans.

Turbine overhauling involves disassembling, inspecting, repairing, and reassembling the turbine to ensure optimal performance. PM work involves routine maintenance to prevent breakdowns.

  • Turbine overhauling involves disassembling the turbine and inspecting each component for wear and damage

  • Any damaged or worn components are repaired or replaced

  • The turbine is then reassembled and tested to ensure optimal performance

  • PM work involves routine maintenance such as cleaning, lubricat...read more

Add your answer

Q6. Centrifugal pump's work is what

Ans.

Centrifugal pump's work is to convert mechanical energy from a motor into kinetic energy to increase the pressure of a fluid.

  • Converts mechanical energy into kinetic energy

  • Increases the pressure of a fluid

  • Uses a rotating impeller to create a flow of fluid

Add your answer

Q7. Type of pump , triple shootting pump ?

Ans.

A triple shooting pump is a type of pump that has three separate outlets for discharging fluid.

  • Triple shooting pumps are commonly used in industrial applications where precise control of fluid flow is required.

  • These pumps are designed to handle high pressure and high flow rate applications.

  • Examples of triple shooting pumps include triplex pumps used in oil and gas industry for well stimulation.

  • They are also used in firefighting equipment for high pressure water delivery.

Add your answer

Q8. Explain PTW procedure

Ans.

PTW stands for Permit to Work. It is a procedure used to ensure safety when performing high-risk tasks.

  • PTW is a written document that outlines the steps to be taken before starting a high-risk task.

  • It involves identifying potential hazards, assessing risks, and implementing control measures.

  • PTW is issued by a competent authority and must be signed by all parties involved in the task.

  • It is important to follow the PTW procedure to prevent accidents and ensure the safety of all ...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at BINDUMADHAV PHARMA

based on 8 interviews
Interview experience
4.8
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.0
 • 361 Interview Questions
3.7
 • 343 Interview Questions
4.0
 • 277 Interview Questions
4.0
 • 195 Interview Questions
3.9
 • 168 Interview Questions
3.5
 • 143 Interview Questions
View all
Top Gas Arabian Services Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter