Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Generic questions , easy to solve.

Round 2 - Technical 

(2 Questions)

  • Q1. Related to Heat Mass Transfer
  • Q2. Related to electrical operations
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Technical 

(2 Questions)

  • Q1. I am electrical technician Offshor returner
  • Q2. Diploma 12th
Round 2 - Technical 

(1 Question)

  • Q1. To
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Why transformer is rated in kva ?
  • Ans. 

    Transformers are rated in kVA because it indicates the maximum amount of power that can be safely handled by the transformer.

    • kVA rating is used to determine the maximum load that a transformer can handle without overheating.

    • It takes into account both the voltage and current ratings of the transformer.

    • kVA rating helps in selecting the right size of transformer for a specific application.

    • For example, a 100 kVA transforme...

  • Answered by AI
  • Q2. Full form of MCCB?
  • Ans. 

    MCCB stands for Molded Case Circuit Breaker.

    • MCCB is a type of circuit breaker that is commonly used in electrical distribution systems.

    • It provides protection against overcurrent and short circuit faults.

    • MCCBs have adjustable trip settings for different levels of current protection.

    • Examples of MCCB manufacturers include Schneider Electric, Siemens, and ABB.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance on high and low voltage breakers, motors, and transformers.

    • Test and calibrate various protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV test, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, instal...

  • Answered by AI
  • Q2. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance tasks on high and low voltage breakers, motors, and transformers.

    • Test and calibrate protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV tests, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, install...

  • Answered by AI
  • Q3. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, switches, relays, and testing/calibration of protections.

    • Preventive maintenance of H.V & LV breakers, motors, transformers, switches, etc.

    • Corrective maintenance of HV/MV/LV switchgears, breakers, cubicles, etc.

    • Testing and calibration of various protection relays for motors, transformers, generators.

    • Transforme...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11
KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV
Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breaker cubicle, earthling Switches ,Generator
earthling Switch ETC. Testing and calibration of all kinds of protections Relay of High Voltage and
low Voltage Motors, Transformers ,Generator like Under Voltage Relay , locked Rotor Relay
,Differential Relay , Negative Phase Sequence Relay , Over current/Thermal Over Current Relay ,
Bucholz Relay , DGPT Relay ETC. Transformer Oil BDV Test, Thermal Scanning , Earth fault and
Prediction Test of Equipment .Termination of high Voltage Motors , Cable Errection , Installation of
Motors, and Trial/Load Test. Transformer Oil Extracting ,Testing (BDV), Oil Filtration .
Equipments Of Oil & Gas Plant , Chlorine Plant, co2 plant
Maintenance of battery Banks , UPS for auxiliary Start UP and Control Voltage call safe supply.
EQUIPMENT UNDER RESPONSIBILITIES :
 MV MOTORS UPTO 2400 KW / 3 PHASE / 6600V / 60HZ
 LV MOTORS UPTO 125 KW / 3PHANSE / 380V / 60HZ
 RECTIFIER FOR CL2 PLANT CELL 3000 AMP / 380/60HZ / 120V DC
 TRANSFORMERS 15.75 KV / 230 KV – 150MVA
 TRANSFORMERS 15.75 KV / 6.6KV – 80 MVA
 TRANSFORMERS 6.6KV / 380V – 800KVA
 BATTERY BANKS 2000 AMP
 INVERTER / CHARGER 2000 AMP  SWITCH GEARS MV 6.6 KV / 3500 AMP SWITCH
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Galending tarmntion motar megring commissioning. Vfd
  • Q2. Commissioning. Vfd motar galanding tarmntion

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir
I'm afzal Mallick electrical technician 10 years gulf experience 3 time shut down experience ecnr passport holder diploma electrical engineering. Phon, XXXXX
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Friendly interview
  • Q2. Which department
  • Q3. What is my response
  • Q4. When will join the company
Round 2 - Technical 

(1 Question)

  • Q1. What are your plan
Round 3 - Technical 

(1 Question)

  • Q1. Which of these locations

Interview Preparation Tips

Topics to prepare for Al Turki Enterprises Electrical Supervisor interview:
  • Electrical Maintenance
Interview preparation tips for other job seekers - Quality is a goal
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Assigned for the Construction, Commissioning and Operation works related to tunnel system
  • Q2. Work includes Loop checking, testing, commissioning, functional test and trouble shooting of LV Switch gear. MCC, Motors, VFD

Interview Preparation Tips

Interview preparation tips for other job seekers - trouble shooting of LV Switch gear. MCC, Motors, VFD, PLC, BMS system, FIRE ALARM and LIGHTING system Installation.
Round 1 - Technical 

(2 Questions)

  • Q1. My education completed my experience electrical associate Alstom manufacturing pvt India
  • Q2. My all experiences plant mantenance

Interview Preparation Tips

Interview preparation tips for other job seekers - New job shair in power sector oils and gas

I was interviewed before Nov 2020.

Interview Questionnaire 

4 Questions

  • Q1. Types of transformer
  • Ans. 

    Types of transformers include power transformers, distribution transformers, autotransformers, isolation transformers, and instrument transformers.

    • Power transformers are used to step up or step down voltage in power transmission systems.

    • Distribution transformers are used to step down voltage for distribution to consumers.

    • Autotransformers have a single winding and are used for voltage regulation.

    • Isolation transformers p...

  • Answered by AI
  • Q2. Motor maintenance
  • Q3. What is ir test
  • Ans. 

    IR test stands for Insulation Resistance test which is used to measure the resistance of insulation material.

    • IR test is used to check the quality of insulation material used in electrical equipment.

    • It helps to detect any insulation failure or breakdown in the equipment.

    • The test involves applying a high voltage to the insulation material and measuring the current flowing through it.

    • The measured resistance value is compa...

  • Answered by AI
  • Q4. What is ct g
  • Ans. 

    CT stands for Current Transformer, a device used to measure electrical current.

    • CT is a type of transformer that steps down high current to a lower, measurable level.

    • It is commonly used in power systems to measure current flowing through a circuit.

    • CTs are also used for protection purposes, such as detecting overcurrent or short circuits.

    • CTs can be either solid-core or split-core, with the latter being easier to install.

    • ...

  • Answered by AI

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Group Interview Questions
3.9
 • 177 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
Bharat Petroleum Interview Questions
4.2
 • 153 Interviews
GAIL Interview Questions
4.5
 • 78 Interviews
Baker Hughes Interview Questions
4.0
 • 51 Interviews
View all
Electrical Engineer
28 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Instrument Engineer
24 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Drilling Fluid Engineer
18 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Graduate Engineer Trainee (Get)
17 salaries
unlock blur

₹1.2 L/yr - ₹2.2 L/yr

Mechanical Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Explore more salaries
Compare Focus Energy with

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Tata Power

3.9
Compare

Essar Group

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview