Q1. Specifications of material which used for building construction?
Materials used in building construction include concrete, steel, wood, brick, and stone.
Concrete is used for foundations, walls, and floors.
Steel is used for structural support and framing.
Wood is used for framing, flooring, and finishing.
Brick is used for walls and facades.
Stone is used for walls, flooring, and decorative features.
Q2. What is difference in execution and work planning?
Execution is the implementation of work planning. Work planning is the process of creating a plan to achieve a goal.
Execution involves carrying out the tasks outlined in the work plan
Work planning involves identifying the steps needed to achieve a goal
Execution requires following the timeline and budget set in the work plan
Work planning involves considering resources, constraints, and potential obstacles
Example: Work planning for a project involves creating a timeline, identi...read more
Q3. What MS stucture rate per 1 SQM?
The MS structure rate per 1 SQM varies depending on the type of structure and location.
The rate can range from $50 to $200 per SQM.
Factors that affect the rate include the type of material used, labor costs, and location.
For example, the rate for a steel structure in a rural area may be lower than that of a concrete structure in a city.
It is important to get a detailed quote from a contractor before starting any construction project.
Q4. What is rate analysis ?
Rate analysis is the process of determining the rates of various items of work in a construction project.
It involves breaking down the cost of a project into individual components.
It helps in estimating the cost of a project accurately.
It takes into account factors such as materials, labor, equipment, and overhead costs.
For example, rate analysis can be used to determine the cost of laying a foundation, including the cost of excavation, concrete, reinforcement, and labor.
It i...read more
Q5. What is the procedure for water proofing?
Waterproofing procedure involves surface preparation, application of waterproofing material and quality control measures.
Surface preparation involves cleaning and repairing the surface to be waterproofed.
Waterproofing material can be applied using various methods such as spraying, brushing or rolling.
Quality control measures include checking for leaks and ensuring proper curing of the waterproofing material.
Different types of waterproofing materials are available such as bitu...read more
Q6. What are types of vitrified tile?
Vitrified tiles are of two types - soluble salt and double charge.
Soluble salt vitrified tiles have a pattern that is printed on the surface of the tile and then coated with a layer of liquid glass.
Double charge vitrified tiles have two layers of pigment that are baked together to create a pattern that goes all the way through the tile.
Other types of vitrified tiles include glazed vitrified tiles, full-body vitrified tiles, and digital vitrified tiles.