Q1. What are the different types of pipes used in water supply project

Ans.

There are several types of pipes used in water supply projects, including PVC, HDPE, copper, galvanized steel, and PEX.

  • PVC pipes are commonly used due to their affordability, durability, and resistance to corrosion.

  • HDPE pipes are known for their flexibility, high strength, and resistance to chemicals.

  • Copper pipes are often used for indoor plumbing due to their excellent heat and corrosion resistance.

  • Galvanized steel pipes are used in older water supply systems but are being p...read more

View 2 more answers
right arrow

Q2. How will you confirm the proper vertical alingment of Tubewell pipe lowering.

Ans.

To confirm the proper vertical alignment of Tubewell pipe lowering, measurements and visual inspections can be conducted.

  • Measure the verticality of the pipe using a plumb bob or laser level.

  • Inspect the pipe for any visible signs of misalignment or tilting.

  • Compare the measurements and visual observations with the specified tolerances.

  • Ensure that the pipe is securely anchored to prevent any movement or deviation from the desired alignment.

  • Perform regular checks during the lower...read more

View 1 answer
right arrow

Q3. Do you work on project monitoring and inspection of water supply project.

Ans.

Yes, I have experience in project monitoring and inspection of water supply projects.

  • I have worked on multiple water supply projects where I was responsible for monitoring and inspecting the quality of the water supply.

  • I have conducted regular inspections to ensure compliance with quality standards and regulations.

  • I have implemented quality control measures to identify and address any issues or deficiencies in the water supply system.

  • I have collaborated with engineers and tec...read more

View 1 answer
right arrow

Q4. Do you know to prepare check list for every components of item to be execute as per RFP.

Ans.

Yes

  • Yes, I am familiar with preparing checklists for every component of an item to be executed as per the RFP.

  • I understand the importance of having a comprehensive checklist to ensure all requirements are met.

  • I have experience in creating checklists for quality control processes and inspections.

  • I am proficient in identifying critical components and their associated requirements.

  • I can prioritize checklist items based on their significance and impact on quality.

  • I am detail-orien...read more

View 1 answer
right arrow
Discover Fichtner Consulting Engineers interview dos and don'ts from real experiences

Q5. What will be your approach on project management staregy.

Ans.

My approach to project management strategy is to prioritize clear communication, establish realistic goals, and continuously monitor progress.

  • Prioritize clear and effective communication with all stakeholders

  • Establish realistic and achievable goals and milestones

  • Continuously monitor project progress and make necessary adjustments

  • Implement quality control measures to ensure adherence to standards

  • Regularly assess risks and develop contingency plans

  • Encourage collaboration and te...read more

View 1 answer
right arrow

Q6. What's are the components of a Single village scheme.

Ans.

A Single village scheme consists of various components aimed at improving the quality of life in a single village.

  • Infrastructure development

  • Access to clean water and sanitation facilities

  • Education and skill development

  • Healthcare facilities

  • Livelihood opportunities

  • Social welfare programs

  • Community empowerment

View 1 answer
right arrow
Are these interview questions helpful?

Q7. Which of the following materials will have lowest cutting speed? a. Mild steel b. Tool steel c. Brass

Ans.

Brass will have the lowest cutting speed.

  • Brass is softer and more ductile compared to mild steel and tool steel.

  • Softer materials like brass require lower cutting speeds to prevent excessive tool wear and heat generation.

  • Tool steel is harder than mild steel and brass, so it will have a higher cutting speed compared to the other two materials.

Add your answer
right arrow

Q8. What are the norms and regulations for construction sites?

Ans.

Construction sites must adhere to various norms and regulations to ensure safety and compliance.

  • Construction sites must follow local building codes and regulations set by authorities.

  • Safety measures such as proper fencing, signage, and protective gear for workers are mandatory.

  • Environmental regulations must be followed to prevent pollution and protect natural resources.

  • Regular inspections and permits are required to ensure compliance with regulations.

  • Proper waste management a...read more

Add your answer
right arrow
Share interview questions and help millions of jobseekers 🌟
man with laptop

Q9. Equipment erection procedure and testing procedures

Ans.

Equipment erection involves following a specific procedure to ensure proper installation and testing procedures are carried out to verify functionality.

  • Equipment erection procedure involves following manufacturer's guidelines and specifications.

  • Testing procedures include conducting insulation resistance tests, continuity tests, and functional tests.

  • Ensure all safety precautions are followed during equipment erection and testing procedures.

  • Document all steps taken during equip...read more

Add your answer
right arrow

Q10. What are stresses inside a pipe

Ans.

Stresses inside a pipe refer to the internal forces acting on the pipe walls due to pressure, temperature changes, and external loads.

  • Stresses can be caused by internal pressure from fluid flow inside the pipe.

  • Temperature changes can lead to thermal stresses as the pipe expands or contracts.

  • External loads such as weight of the pipe itself or additional weight on top can also contribute to stresses.

  • Stresses can lead to deformation, buckling, or failure of the pipe if not prope...read more

Add your answer
right arrow

Q11. What are the site specifications?

Ans.

Site specifications refer to the specific requirements and details for a construction site.

  • Site dimensions and boundaries

  • Soil type and bearing capacity

  • Required slope and drainage

  • Permissible noise and dust levels

  • Materials and equipment allowed on site

Add your answer
right arrow

Q12. What is GIS in Substation

Ans.

GIS in Substation stands for Gas Insulated Switchgear, which is a type of switchgear used in substations for high voltage transmission.

  • GIS is a type of switchgear that uses sulfur hexafluoride gas to insulate and protect electrical equipment.

  • It is compact and requires less space compared to traditional air-insulated switchgear.

  • GIS is commonly used in high voltage substations to improve reliability and reduce maintenance costs.

Add your answer
right arrow

Q13. Different Field In Civil Engineering

Ans.

Different fields in civil engineering include structural engineering, transportation engineering, geotechnical engineering, environmental engineering, and construction engineering.

  • Structural engineering focuses on designing and analyzing structures such as buildings, bridges, and dams.

  • Transportation engineering deals with planning, designing, and operating transportation systems like roads, highways, and railways.

  • Geotechnical engineering involves studying the behavior of eart...read more

Add your answer
right arrow

Q14. Type test of Transformer

Ans.

Type test of Transformer involves testing the transformer to ensure it meets specified requirements.

  • Type test includes routine tests like insulation resistance, ratio test, winding resistance, etc.

  • Special tests like temperature rise test, impulse test, and short circuit test are also conducted.

  • Type test ensures the transformer can handle specified loads and environmental conditions.

  • Results of type test determine the quality and reliability of the transformer.

  • Type test is esse...read more

Add your answer
right arrow

Q15. What Is mach number

Ans.

Mach number is a dimensionless quantity representing the ratio of the speed of an object to the speed of sound in the medium through which the object is moving.

  • Mach number is used to determine the speed of an object relative to the speed of sound.

  • It is calculated as the ratio of the speed of the object to the speed of sound in the medium.

  • For example, an aircraft flying at Mach 2 is traveling at twice the speed of sound in the air.

Add your answer
right arrow

Q16. Testing of CT PT

Ans.

Testing of CT PT involves verifying accuracy, polarity, and insulation resistance.

  • Verify accuracy by comparing readings with known standards.

  • Check polarity to ensure correct connection of leads.

  • Test insulation resistance to prevent short circuits.

  • Perform ratio and burden tests to confirm proper functioning.

  • Calibrate equipment regularly for accurate results.

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Fichtner Consulting Engineers

based on 23 interviews
Interview experience
4.1
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Apollo Hospitals Logo
4.1
 • 278 Interview Questions
Zydus Lifesciences Logo
4.1
 • 210 Interview Questions
Episource Logo
3.9
 • 209 Interview Questions
Startek Logo
3.1
 • 180 Interview Questions
Zomato Logo
3.8
 • 150 Interview Questions
Tata Communications Logo
4.0
 • 144 Interview Questions
View all
Recently Viewed
SALARIES
Bridgei2i Analytics Solutions
SALARIES
Fichtner Consulting Engineers
INTERVIEWS
GAVS Technologies
No Interviews
INTERVIEWS
Caterpillar Inc
No Interviews
INTERVIEWS
Surya Software Systems
No Interviews
INTERVIEWS
Ecotech Software
No Interviews
SALARIES
Fichtner Consulting Engineers
INTERVIEWS
Hibiz Solutions
No Interviews
SALARIES
Fichtner Consulting Engineers
SALARIES
Bridgei2i Analytics Solutions
Top Fichtner Consulting Engineers Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter