Filter interviews by
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
Clutches are devices used to transmit power from one component to another. There are several types of clutches.
Friction clutch
Electromagnetic clutch
Hydraulic clutch
Centrifugal clutch
Dog clutch
Cone clutch
Multi-plate clutch
A clutch is a mechanical device that engages and disengages power transmission between two rotating shafts.
Clutches are commonly used in vehicles to allow the engine to start and stop without turning off the transmission.
They are also used in machines to control the power output and speed.
Clutches can be operated manually or automatically.
There are different types of clutches, including friction clutches, hydraulic clu...
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Quality tools are techniques and methods used to ensure products or services meet customer requirements and expectations.
Quality tools include statistical process control, root cause analysis, and failure mode and effects analysis.
They help identify and eliminate defects, reduce waste, and improve efficiency.
Examples of quality tools include Pareto charts, fishbone diagrams, and control charts.
Quality tools are used in...
5S is a methodology used in production to improve efficiency and organization.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workspace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workspace.
Standardize involves creating procedures and guidelines for maintaining the w...
Production process is a series of steps involved in the manufacturing of a product or providing a service.
It involves planning, designing, testing, and executing the process
It includes the use of raw materials, machinery, and labor to produce the final product
It aims to optimize efficiency, quality, and cost-effectiveness
Examples include assembly line production, software development, and food processing
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Job Portal and was interviewed before Sep 2021. There were 4 interview rounds.
I expect to utilize my technical skills and knowledge to optimize production processes and ensure efficient operations.
I expect to work closely with the production team to identify areas for improvement and implement solutions.
I expect to monitor production metrics and analyze data to identify trends and areas for improvement.
I expect to collaborate with other departments, such as maintenance and quality control, to en...
Min by 5s means finding the minimum value among a set of numbers that are multiples of 5.
Identify all the numbers that are multiples of 5 in the given set.
Compare these numbers to find the smallest value.
The smallest number among the multiples of 5 is the min by 5s.
Cumpani rul is a term used in production engineering to refer to company rules and regulations.
Cumpani rul are guidelines set by the company to ensure smooth operations.
These rules may include safety protocols, quality standards, and production processes.
Employees are expected to adhere to cumpani rul to maintain efficiency and consistency in production.
Failure to follow cumpani rul may result in disciplinary action or...
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
based on 4 reviews
Rating in categories
Senior Engineer
212
salaries
| ₹5 L/yr - ₹18 L/yr |
Assistant Manager
190
salaries
| ₹8.2 L/yr - ₹21.2 L/yr |
Project Engineer
97
salaries
| ₹1.8 L/yr - ₹8 L/yr |
Engineer
92
salaries
| ₹2 L/yr - ₹10 L/yr |
Applications Engineer
87
salaries
| ₹2.8 L/yr - ₹6.7 L/yr |
John Deere
Cummins
ABB
Caterpillar Inc