Drillmec India
Fluxwings Solutions Interview Questions and Answers
Q1. Which modules are installed in the PLC in the rig you are working on?
I am not currently working on a rig, so I do not have information on the specific modules installed in the PLC.
If I were working on a rig, I would consult the rig's documentation or speak with the rig's electrical team to determine which modules are installed in the PLC.
Common modules that may be installed in a rig's PLC include input/output modules, communication modules, and power supply modules.
The specific modules installed may vary depending on the rig's manufacturer and...read more
Q2. Which breaker installation is in your vfd pcr
The breaker installation in my VFD PCR is a 3-pole circuit breaker.
The VFD PCR typically requires a 3-pole circuit breaker for installation.
The circuit breaker should be rated for the appropriate voltage and current of the VFD.
Proper installation and wiring of the circuit breaker is crucial for safety and functionality.
Examples of suitable circuit breakers include Siemens QP, Square D QO, and Eaton BR breakers.
Q3. What sensors are on your rig?
There are various sensors on the rig including pressure sensors, temperature sensors, and vibration sensors.
Pressure sensors are used to monitor the pressure of the drilling fluid and the wellbore.
Temperature sensors are used to monitor the temperature of the drilling fluid and the equipment.
Vibration sensors are used to detect any abnormal vibrations in the equipment.
Other sensors may include flow sensors, level sensors, and gas sensors.
Q4. Tell me how to measure tmt, ms plate, ms pipe etc.
TMT, MS plate, MS pipe etc. can be measured using various tools and techniques.
TMT can be measured using a TMT bar testing machine
MS plate thickness can be measured using a thickness gauge
MS pipe diameter can be measured using a pipe diameter tape or caliper
Weight of the materials can also be measured using a weighing scale
Q5. Tell about oil and gas pipe fittings.
Oil and gas pipe fittings are components used to connect pipes and control the flow of fluids in oil and gas pipelines.
Pipe fittings include elbows, tees, reducers, and flanges.
They are made of various materials such as steel, brass, and plastic.
Fittings must be compatible with the type of pipe and fluid being transported.
Proper installation and maintenance of fittings is crucial for pipeline safety and efficiency.
Q6. How many of experience in drilling services?
I have 5 years of experience in drilling services.
5 years of experience in drilling services
Managed drilling operations for various projects
Implemented cost-effective strategies to optimize drilling processes
Q7. How to check diesel quality?
Diesel quality can be checked through various methods.
Check for water content using a water finding paste
Test for sediment and particulate matter using a centrifuge
Measure the cetane number to determine ignition quality
Check for sulfur content using a sulfur test kit
Inspect for color and odor abnormalities
Conduct a flash point test to determine the temperature at which diesel fuel will ignite
Use a fuel testing laboratory for more comprehensive analysis
Q8. What are the internal parts of mudpump?
Internal parts of a mud pump include pistons, liners, valves, and fluid end modules.
Pistons
Liners
Valves
Fluid end modules
Q9. Witch location in India.
India is a diverse country with many locations suitable for mechanical engineers.
Pune, Maharashtra - known for its automotive and manufacturing industries
Bengaluru, Karnataka - hub for aerospace and defense companies
Chennai, Tamil Nadu - major automobile manufacturing center
Hyderabad, Telangana - emerging as a hub for engineering and technology companies
More about working at Drillmec India
Top HR Questions asked in Fluxwings Solutions
Interview Process at Fluxwings Solutions
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month