Upload Button Icon Add office photos

Filter interviews by

Dinesh Engineers Project Engineer Interview Questions and Answers

Updated 17 Feb 2024

Dinesh Engineers Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Just about your self, and discussed about CTC
  • Q2. Ask about previous employment
  • Q3. Ask about current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - M

Interview questions from similar companies

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Ans. 

    Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.

    • Bachelor's degree in Civil Engineering

    • 5+ years of experience in project management

    • Proficient in AutoCAD and project management software

    • Strong communication and leadership skills

    • Successfully led a team in completing a major infrastructure project on time and within budget

  • Answered by AI
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

I applied via Recruitment Consultant

Interview Questionnaire 

4 Questions

  • Q1. Talked-about work & hobby .
  • Q2. How will you make improvement for organisations growth.
  • Ans. 

    I will drive innovation through cross-functional collaboration, continuous learning, and data-driven decision-making.

    • Promote cross-functional collaboration to leverage diverse perspectives and expertise

    • Encourage continuous learning and development to stay ahead of industry trends

    • Utilize data-driven decision-making to identify opportunities for growth and optimization

  • Answered by AI
  • Q3. Regarding facilities and Salary discussion
  • Q4. Describing about work and projects .

Interview Preparation Tips

Round: Resume Shortlist
Experience: This was on demanding , my profile matched optical fibre manufacturing.

General Tips: My suggestion for all interviews - always be honest for self and job during expressing interview period. Give correct data with politely . Say all things very openly.
Skills: Problem Solving, Leadership, Decision Making Skills
Duration: 1-4 weeks

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All about Execution work.
  • Q2. Long answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patience and effort for you.

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What is the selari on this company
Round 3 - HR 

(4 Questions)

  • Q1. I agree this job please clear
  • Q2. Why this job posting here
  • Q3. I like this job but not clear please call
  • Q4. I am agreed this job

Interview Preparation Tips

Interview preparation tips for other job seekers - Please clear this job satisfaction and clear selari

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What are different types of cables
  • Ans. 

    Different types of cables include coaxial, twisted pair, fiber optic, and USB.

    • Coaxial cable is used for cable TV and internet connections

    • Twisted pair cable is used for Ethernet connections

    • Fiber optic cable is used for high-speed data transmission over long distances

    • USB cable is used for connecting devices to a computer

  • Answered by AI
  • Q2. What did you do during internship
  • Ans. 

    During my internship, I worked on various engineering projects and gained hands-on experience in project management, design, and problem-solving.

    • Assisted in designing and implementing engineering solutions for clients

    • Collaborated with a team to develop project plans and timelines

    • Conducted research and analysis to support project decision-making

    • Participated in site visits and inspections to assess project progress

    • Prepar...

  • Answered by AI
  • Q3. Types of transformers, basic principles of transformers working
  • Ans. 

    Transformers are electrical devices that transfer energy from one circuit to another through electromagnetic induction.

    • Transformers are of two types - step-up and step-down transformers

    • The basic principle of transformer working is electromagnetic induction

    • The transformer consists of two coils - primary and secondary

    • When an alternating current flows through the primary coil, it creates a magnetic field which induces a v...

  • Answered by AI
  • Q4. Working of induction motor
  • Ans. 

    An induction motor works on the principle of electromagnetic induction to convert electrical energy into mechanical energy.

    • Consists of a stator and a rotor

    • Stator has a set of coils that produce a rotating magnetic field

    • Rotor is made up of conductive bars and is placed inside the stator

    • The rotating magnetic field induces a current in the rotor, which in turn produces a magnetic field

    • The interaction between the two magne...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Polycab Wires Project Engineer interview:
  • basics of electrical engineering
  • Transformers
  • Motors
Interview preparation tips for other job seekers - Interview was around resume. Prepare everything regarding what you write in reume

I applied via Naukri.com and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Oprical fiber

Interview Preparation Tips

Interview preparation tips for other job seekers - All question od OFC project , Rout survey, ROW solve, T&D (HDD, OT) ,blowing ,spliceing,chamber & Rout markar installation,Rout AT, and all rout document part

Interview Questionnaire 

1 Question

  • Q1. They are asking for my previous experience details & FTTH,NLD,MT, related questions

Dinesh Engineers Interview FAQs

How many rounds are there in Dinesh Engineers Project Engineer interview?
Dinesh Engineers interview process usually has 1 rounds. The most common rounds in the Dinesh Engineers interview process are HR.
How to prepare for Dinesh Engineers Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dinesh Engineers. The most common topics and skills that interviewers at Dinesh Engineers expect are Optical Fiber, Project Execution, Fiber Splicing, Project Coordination and Project Engineering.

Tell us how to improve this page.

Dinesh Engineers Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Dinesh Engineers Project Engineer Salary
based on 14 salaries
₹2.7 L/yr - ₹7 L/yr
24% less than the average Project Engineer Salary in India
View more details

Dinesh Engineers Project Engineer Reviews and Ratings

based on 5 reviews

3.8/5

Rating in categories

3.1

Skill development

3.4

Work-life balance

3.5

Salary

2.9

Job security

2.7

Company culture

2.6

Promotions

2.8

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Field Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Dinesh Engineers with

Sterlite Technologies

3.8
Compare

Tejas Networks

4.0
Compare

HFCL Limited

4.0
Compare

Bharti Airtel

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview