Filter interviews by
Top trending discussions
posted on 9 Sep 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
The assembly line sequence involves a step-by-step process of assembling parts to create a final product.
The process starts with the arrival of raw materials
Parts are then assembled in a specific order
Quality checks are performed at various stages
The final product is packaged and shipped
Efficiency and safety are key considerations throughout the process
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
Open loop and closed loop are two modes of operation in hydraulic systems.
Open loop operation: The hydraulic system operates without feedback control. The output is not adjusted based on the system's performance.
Closed loop operation: The hydraulic system uses feedback control to adjust the output based on the system's performance.
Open loop systems are simpler and less expensive, but they lack precision and accuracy.
Cl...
The starting circuit is responsible for initiating the engine's operation.
The starting circuit consists of components such as the battery, starter motor, ignition switch, and solenoid.
When the ignition switch is turned on, it sends a signal to the solenoid, which then engages the starter motor.
The starter motor uses electrical energy from the battery to turn the engine's crankshaft, starting the combustion process.
Once...
I am a highly skilled and experienced service engineer with a proven track record of successfully troubleshooting and resolving complex technical issues.
I have a strong technical background and extensive experience in diagnosing and repairing equipment.
I am a quick learner and can adapt to new technologies and processes easily.
I have excellent communication skills and can effectively communicate with customers and team...
My core values include integrity, accountability, and continuous learning.
Integrity: I believe in always doing the right thing, even when no one is watching.
Accountability: I take ownership of my actions and responsibilities.
Continuous learning: I strive to constantly improve my skills and knowledge.
Example: I once discovered a mistake in a project I was working on, and instead of ignoring it, I took responsibility and...
posted on 23 Sep 2022
Discussed on Denomination topic
posted on 23 May 2024
The source name of the laser cutting machine is typically the manufacturer's name or a specific model name.
The source name could be the manufacturer's name, such as Trumpf or Amada.
It could also be a specific model name, like Trumpf TruLaser Series or Amada LC3015.
I appeared for an interview in Aug 2024.
AC changes direction periodically while DC flows in one direction continuously.
AC changes direction periodically, while DC flows in one direction continuously
AC is commonly used in household appliances and power distribution systems
DC is commonly used in batteries and electronic devices
AC voltage can be easily converted using transformers, while DC voltage requires more complex conversion methods
Grounding is the process of connecting an electrical circuit or device to the earth or to a reference point that is at the same potential as the earth.
Grounding helps to prevent electric shock and protect equipment from damage.
It provides a path for excess electrical current to flow safely to the ground.
Grounding also helps to reduce electromagnetic interference and improve the performance of electrical systems.
Example...
Newton's 2nd law states that the acceleration of an object is directly proportional to the net force acting on it and inversely proportional to its mass.
F = ma (force equals mass times acceleration)
Acceleration is in the same direction as the net force
The greater the force applied to an object, the greater its acceleration
The greater the mass of an object, the smaller its acceleration for a given force
Permanent location is required for work to ensure timely response to service calls and availability for on-site troubleshooting.
Timely response to service calls
Availability for on-site troubleshooting
Efficient scheduling of work orders
posted on 23 Feb 2022
I appeared for an interview before Feb 2021.
posted on 4 Apr 2022
I applied via Naukri.com and was interviewed before Apr 2021. There was 1 interview round.
I applied via Naukri.com
posted on 8 May 2024
Normal question for last employer
Electrical Engineer
7
salaries
| ₹3.5 L/yr - ₹4 L/yr |
Assistant Mechanical Manager
6
salaries
| ₹7 L/yr - ₹7 L/yr |
Instrument Engineer
6
salaries
| ₹3.1 L/yr - ₹4.5 L/yr |
Senior Engineer
5
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Instrumentation Technician
5
salaries
| ₹3.5 L/yr - ₹4 L/yr |
Ge India Industrial
Gilbarco Veeder Root
Kirloskar Toyota Textile Machinery
L&T–MHI Power Boilers