I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
Semiconductors are materials that have electrical conductivity between that of a conductor and an insulator.
Silicon
Germanium
Gallium arsenide
Indium phosphide
All equipment used by Sub-station 132/33 KV must meet specific requirements and standards.
Equipment must be rated for 132/33 KV operation
Equipment must be compatible with the sub-station's infrastructure
Regular maintenance and testing of equipment is essential
Safety protocols must be followed when working with equipment
Top trending discussions
I was interviewed in Oct 2016.
I am interested in the manufacturing sector because of its unique challenges and opportunities for growth.
I have always been fascinated by the process of creating physical products and seeing them come to life.
I enjoy working with my hands and being involved in the production process.
Manufacturing offers a wide range of career paths, from engineering to operations management.
I believe that the manufacturing sector play...
posted on 14 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
I applied via Times Job and was interviewed before Dec 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand. Cycle time is the time it takes to complete one cycle of a process.
Takt time is calculated by dividing the available production time by the customer demand.
Cycle time is the time it takes to complete one unit of a product.
Cycle time can be used to identify bottlenecks in the production process.
Reducing cycle time can increase productivit...
Line balancing is the process of optimizing workloads across an assembly line to improve efficiency and productivity.
Identify the tasks required to complete the assembly process
Determine the cycle time for each task
Calculate the total available work time
Allocate tasks to workstations based on cycle time and available work time
Adjust the allocation to minimize idle time and maximize efficiency
Junior Shop Manager
1.4k
salaries
| ₹1.7 L/yr - ₹10.4 L/yr |
Junior Manager
901
salaries
| ₹2.4 L/yr - ₹10.6 L/yr |
Diploma Trainee Engineer
537
salaries
| ₹1.1 L/yr - ₹3.5 L/yr |
Design Engineer
337
salaries
| ₹1.9 L/yr - ₹8.5 L/yr |
Service Engineer
297
salaries
| ₹1.3 L/yr - ₹8.5 L/yr |
BHEL
TCS
Larsen & Toubro Limited
Thermax Limited