Q1. What is tranformer? Transformer is a statics device and x-mer working mutual induction and x-mer voltage convert step up and step down.
A transformer is a static device that uses mutual induction to convert voltage levels.
Transformers are used to increase or decrease the voltage in electrical circuits.
They consist of two or more coils of wire, known as windings, that are wound around a core.
The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.
When an alternating current flows through the primary winding, it creates a changing magnetic field in the ...read more
Q2. What is cilica gel.? Cilica gel is x-mer in moisture absorbed
Silica gel is a desiccant that absorbs moisture to keep things dry.
Silica gel is a porous, granular form of silicon dioxide.
It is commonly used in packaging to prevent moisture damage to products.
It can also be found in humidifiers, dehumidifiers, and air conditioning systems.
Silica gel changes color as it absorbs moisture, indicating when it needs to be replaced.
It is non-toxic and safe to handle.
Q3. What is x-mer oil? X-mer oil is cooling generation of coil
X-mer oil is a type of cooling oil used in transformers to dissipate heat generated by the coil.
X-mer oil is a mineral oil with high dielectric strength and thermal conductivity.
It is used to cool the transformer coil and prevent overheating.
The oil also acts as an insulator to prevent electrical breakdown.
X-mer oil is typically tested for purity and quality to ensure proper functioning of the transformer.
Examples of X-mer oil include Shell Diala, Cargill FR3, and ABB Envirot...read more
Q4. What do you mean by critical path
Critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Critical path determines the shortest possible duration for a project.
It helps in identifying which tasks are most crucial for the project timeline.
Any delay in tasks on the critical path will directly impact the project's completion date.
Activities on the critical path have zero float or slack.
Example: In a construction project, laying the...read more
Q5. What do you mean by tota float
Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total float is calculated by subtracting the early start date of an activity from its late start date.
Activities with total float can be delayed without affecting the project's critical path.
Total float is also known as slack or float.
It helps in identifying activities that have flexibility in their start and finish dates.
Q6. Activities having in engineering WBS
Activities in engineering WBS are specific tasks or work packages that need to be completed to achieve project goals.
Breakdown of engineering design
Procurement of materials
Construction and installation
Testing and commissioning
Documentation and handover