Filter interviews by
I applied via Referral
Melting point is the temperature at which a solid substance turns into a liquid.
Melting point is an important factor in determining the production process of a substance.
Different substances have different melting points, and this can affect the equipment and techniques used in production.
For example, if a substance has a very high melting point, specialized equipment may be needed to melt it.
On the other hand, if a su...
Lining process involves adding a layer of material to the inside of a product to improve its durability or appearance.
Lining can be done using various materials such as cotton, silk, polyester, or leather.
It is commonly used in clothing items such as jackets, skirts, and dresses.
The lining process can also be used in bags, shoes, and other accessories.
The purpose of lining is to provide a smooth and comfortable interio...
The painting process of LINEAR involves applying a coat of paint to a surface in a straight line.
The process is typically used in industrial settings for painting large surfaces such as walls or floors.
It involves using a paint roller or sprayer to apply the paint in a straight line, usually from top to bottom or left to right.
The process requires careful preparation of the surface to be painted, including cleaning and...
Defects in foundry production include porosity, shrinkage, cold shuts, and inclusions.
Porosity: air pockets or voids in the metal caused by gas bubbles
Shrinkage: metal contracts as it cools, causing voids or cracks
Cold shuts: two streams of metal meet but fail to fuse together
Inclusions: foreign materials such as sand or slag become trapped in the metal
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Referral and was interviewed in Oct 2018. There were 5 interview rounds.
I am drawn to your organisation's commitment to innovation and employee development. I expect opportunities for growth and a supportive work culture.
I am impressed by the company's track record of innovation and success in the industry.
I value the emphasis on employee development and growth opportunities within the organisation.
I am looking for a supportive work culture that values teamwork and collaboration.
I expect c...
I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I faced a defect in plastic commodity related to poor quality control during the manufacturing process.
The defect was in the form of cracks and breakages in the plastic products.
It was caused by inadequate monitoring and supervision during the molding and cooling stages.
The defect resulted in a high number of rejected products and customer complaints.
To address the issue, we implemented stricter quality control measure...
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Production Engineer
48
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Senior Engineer
42
salaries
| ₹4 L/yr - ₹9 L/yr |
Quality Engineer
40
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Maintenance Engineer
31
salaries
| ₹1.9 L/yr - ₹7 L/yr |
Production Supervisor
28
salaries
| ₹2 L/yr - ₹5.5 L/yr |
JBM Group
Subros
Ceat Tyres
UNO Minda