Filter interviews by
I appeared for an interview before Jun 2021.
To find the problem of any machine equipment, one can follow these steps:
Start by gathering information about the issue from the user or through observation.
Perform a visual inspection to identify any visible signs of damage or malfunction.
Check for error codes or warning indicators on the equipment's display or control panel.
Use diagnostic tools or instruments to measure and analyze various parameters.
Refer to the equ...
At a time five people diffrent location writing a complaint against the machine's breakdown.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.
I have 10 years of work experience in mechanical engineering.
Designed and implemented mechanical systems for various projects
Performed analysis and simulations to optimize performance
Collaborated with cross-functional teams to ensure project success
Managed and supervised junior engineers
Implemented cost-saving measures in manufacturing processes
I applied via Referral and was interviewed before Jul 2020. There was 1 interview round.
I applied via Job Portal and was interviewed in Jul 2024. There were 2 interview rounds.
What is DBa role do when they find out issue on tablepsace
Oracle database is a relational database management system developed by Oracle Corporation.
Oracle database is used for storing and managing data in a structured format.
It supports SQL as a query language for accessing and manipulating data.
Oracle database offers features like data security, scalability, and high availability.
Examples of Oracle database editions include Oracle Database Standard Edition, Enterprise Editi
Oracle database architecture is a multi-tiered system with components like client, server, and storage.
Consists of physical and logical structures
Includes processes like SQL processing, memory management, and I/O management
Client communicates with server through SQL*Net
Server manages data storage and retrieval
Storage includes data files, control files, and redo log files
posted on 14 Dec 2023
I applied via Referral and was interviewed in Jan 2024. There were 2 interview rounds.
Regarding previous job working details
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
Previous site infrastructure included data centers, networking equipment, servers, and storage systems.
Data centers were located in multiple regions for redundancy.
Networking equipment included routers, switches, and firewalls.
Servers were a mix of physical and virtual machines.
Storage systems used SAN and NAS technologies.
Backup and disaster recovery plans were in place.
Monitoring tools were used to track performance
Multiple scenarios of UPS DG CHILLER FAILURES
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
Questions regarding Corporate Governance
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
I am a dedicated and detail-oriented professional with a strong work ethic and excellent communication skills.
Dedicated and hardworking
Detail-oriented
Strong communication skills
Housekeeping Supervisor
18
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Electrical Technician
18
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Facility Executive
15
salaries
| ₹2.3 L/yr - ₹4.4 L/yr |
Electrician
14
salaries
| ₹1.3 L/yr - ₹2.5 L/yr |
Technical Supervisor
12
salaries
| ₹2.3 L/yr - ₹3 L/yr |
Sodexo
ISS Facility Services
BVG India
Leadec India