Work process in procurement involves identifying needs, sourcing suppliers, negotiating contracts, and managing supplier relationships.
Identifying needs and requirements of the organization
Sourcing potential suppliers through research and networking
Negotiating contracts terms and pricing
Managing supplier relationships and performance
Ensuring timely delivery of goods and services
I am impressed by your company's reputation for innovation and commitment to excellence.
I admire your company's track record of successful projects
I am excited about the opportunity to work with a talented team
I believe my skills and experience align well with the goals of your organization
Top trending discussions
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
posted on 12 Oct 2024
I was interviewed in Apr 2024.
posted on 29 Apr 2021
Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.
Human error: Mistakes or negligence by individuals involved in the project.
Equipment failure: Malfunction or breakdown of machinery or tools.
Environmental conditions: Adverse weather, natural disasters, or other external factors.
Lack of safety measures: Insufficient safety protocols o...
Insufficient maintenance of machinery can lead to breakdowns and production delays.
Regular maintenance schedules should be established and followed.
Proper training should be provided to operators and maintenance personnel.
Use of predictive maintenance techniques can help identify potential issues before they become major problems.
Examples: oil changes, lubrication, cleaning, calibration, inspections.
Failure to maintain...
posted on 10 Nov 2021
posted on 7 Sep 2022
I have 5 years of experience in Officer Procurement.
I have 5 years of experience in Officer Procurement.
During my time as an Officer Procurement, I have successfully procured and managed various resources.
I have developed strong negotiation and communication skills through my experience in Officer Procurement.
I have a proven track record of meeting procurement targets and delivering cost-effective solutions.
I am famili...
To issue a cement bag, follow these steps:
Ensure the recipient has the necessary authorization or purchase order.
Verify the quantity and type of cement required.
Prepare the necessary documentation, such as a delivery note or receipt.
Retrieve the cement bag from the storage area.
Check the bag for any damages or defects.
Record the issuance in the inventory system.
Hand over the cement bag to the recipient, ensuring proper...
I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.
Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
posted on 23 Aug 2024
I applied via Campus Placement and was interviewed in Feb 2024. There were 3 interview rounds.
Basic aptitude test (online)
Basic topics, we have to talk for 5min.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Design Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Electrical Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Procurement Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company