Filter interviews by
Top trending discussions
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Mar 2023. There were 2 interview rounds.
Only 3 questions asked
1. tell about yourself
2. List of car company names
3. Your family details
Only one round
I applied via Job Portal
posted on 30 Jan 2025
Basic question in time and distance problems
I applied via Job Portal and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
based on 14 reviews
Rating in categories
Engineer Trainee
38
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Senior Engineer
12
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Diploma Trainee Engineer
11
salaries
| ₹1.4 L/yr - ₹2 L/yr |
Production Engineer
11
salaries
| ₹1 L/yr - ₹2.2 L/yr |
Trainee
11
salaries
| ₹1.1 L/yr - ₹2.4 L/yr |
Yazaki
JK Tyres
Lucas-TVS
Faurecia