Filter interviews by
I appeared for an interview in Feb 2023.
The question is unclear and lacks context. Please provide more information.
Top trending discussions
I appeared for an interview in Sep 2021.
I applied via Naukri.com and was interviewed before Mar 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2023. There were 6 interview rounds.
Aptitude test done online
Discussion on case handled
I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.
Just basics maths
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
Net working capital is the difference between a company's current assets and current liabilities.
Net working capital measures a company's liquidity and ability to meet short-term obligations.
It is calculated by subtracting current liabilities from current assets.
A positive net working capital indicates that a company has enough current assets to cover its current liabilities.
A negative net working capital suggests that...
To tackle 3000 customers, I would implement efficient customer service strategies and utilize technology to streamline processes.
Implement a customer service team with well-defined roles and responsibilities
Utilize technology such as customer relationship management (CRM) software to manage customer interactions and data
Implement self-service options like online ordering or automated phone systems to handle routine inq...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
posted on 22 Aug 2017
I appeared for an interview in Apr 2017.
The hydraulic pack pressure varies depending on the specific system and application.
Hydraulic pack pressure is the force exerted by the hydraulic fluid in a hydraulic system.
It is typically measured in pounds per square inch (psi) or bar.
The pressure can vary based on the load requirements, system design, and component specifications.
Higher pressure is often required for heavy-duty applications, while lower pressure ma...
2 phase and 3 phase are different types of electrical power distribution systems.
2 phase system has two conductors and produces a single alternating current waveform.
3 phase system has three conductors and produces three alternating current waveforms.
2 phase system is less common and used in older applications.
3 phase system is more efficient and widely used in industrial and commercial settings.
2 phase system requires...
I applied via Recruitment Consultant and was interviewed before May 2020. There were 3 interview rounds.
Some of the top questions asked at the Caterpillar Inc Maintenance Manager interview -
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Design Engineer
227
salaries
| ₹8.8 L/yr - ₹20.3 L/yr |
Engineer
187
salaries
| ₹7 L/yr - ₹25.8 L/yr |
Software Engineer
181
salaries
| ₹7 L/yr - ₹28 L/yr |
Associate Engineer
179
salaries
| ₹4 L/yr - ₹14.9 L/yr |
Senior Associate Engineer
163
salaries
| ₹7.2 L/yr - ₹22 L/yr |
John Deere
ABB
KONE
Sigma Electric Manufacturing Corporation