I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
Asked me about my qualification and collected my all documents.
Top trending discussions
I was interviewed in Apr 2024.
I am responsible for ensuring quality control and quality assurance in the construction of the metro project.
Conducting inspections and tests on materials used in construction
Ensuring compliance with project specifications and standards
Identifying and resolving any quality issues that may arise
Collaborating with project managers and contractors to maintain quality standards
Pre casting is a construction method where concrete elements are cast in a different location before being transported to the construction site.
Pre casting helps in ensuring quality control and reducing construction time on site.
Examples include precast concrete panels, beams, and columns.
It allows for better planning and coordination of construction activities.
posted on 18 Jul 2023
posted on 3 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Project Details Work Assignment
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type o...
A lead is a potential customer or client who has shown interest in a product or service.
A lead is typically generated through marketing efforts such as advertising or networking.
Leads can be obtained through various channels such as social media, email campaigns, or trade shows.
Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.
Qualifying leads involves determin...
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
posted on 31 Jan 2022
I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.
Technical and Aptitude Questions
posted on 26 Sep 2021
I applied via Job Portal and was interviewed in Mar 2021. There were 4 interview rounds.
posted on 23 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2021. There were 4 interview rounds.
The grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of the concrete in megapascals (MPa).
For example, M20 grade concrete means the compressive strength is 20 MPa.
Different grades of concrete are used for different purposes, such as M10 for non-structural purposes and M40 for heavy-duty st
Frequency tests of construction material as per CPWD
Frequency tests of construction material are conducted as per the guidelines provided by CPWD (Central Public Works Department).
The frequency of tests depends on the type of material and its intended use in the construction project.
CPWD provides specific guidelines for different materials such as cement, aggregates, concrete, steel, etc.
The tests may include compressi...
Brick, plaster, and tile work can be checked by inspecting for proper alignment, levelness, and uniformity.
Check for proper alignment of bricks and tiles using a straight edge or level.
Inspect for levelness of plaster using a spirit level.
Check for uniformity of color and texture in tiles.
Ensure that the joints between bricks or tiles are consistent in size and shape.
Look for any cracks or gaps in the plaster or grout ...
To check reinforcement as per drawing, use measuring tape and compare with the drawing. If there is a problem in slab steel, check for any missing bars or incorrect placement.
Use measuring tape to check the length and diameter of reinforcement bars
Compare the measurements with the drawing to ensure they match
Check for any missing bars or incorrect placement
If there is a problem, consult the structural engineer for a so
based on 1 interview
Interview experience
ENO
6
salaries
| ₹0 L/yr - ₹0 L/yr |
CS
5
salaries
| ₹0 L/yr - ₹0 L/yr |
AVP
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Vice President
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Data Entry Operator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company