Add office photos
Employer?
Claim Account for FREE

Bureau Veritas

3.9
based on 1.7k Reviews
Filter interviews by

60+ Interview Questions and Answers

Updated 16 Dec 2024
Popular Designations

Q1. How much capacity the right-angle coupler B stander

Ans.

The right-angle coupler B stander has a capacity of X units.

  • The capacity of the right-angle coupler B stander is determined by its design and material.

  • The specific capacity of the right-angle coupler B stander should be provided by the manufacturer or supplier.

  • It is important to ensure that the right-angle coupler B stander is used within its specified capacity to maintain safety and structural integrity.

View 5 more answers

Q2. What is surface cleanliness?? How do you relate it with surface profile?? Where do you find details about surface profile??

Ans.

Surface cleanliness refers to the absence of contaminants on a surface. It is related to surface profile as contaminants can affect the profile.

  • Surface cleanliness refers to the absence of dirt, dust, oil, grease, or other contaminants on a surface.

  • Contaminants on a surface can affect the adhesion and performance of coatings.

  • Surface profile refers to the roughness or texture of a surface.

  • Contaminants can alter the surface profile by filling in gaps or creating irregularities....read more

View 2 more answers

Q3. How many people going on Liteduty scaffold.

Ans.

The number of people going on Liteduty scaffold depends on its load capacity and safety regulations.

  • The number of people allowed on a Liteduty scaffold is determined by its load capacity.

  • Safety regulations also play a role in determining the number of people allowed on the scaffold.

  • Consulting the manufacturer's guidelines and local safety regulations is essential to determine the maximum number of people.

  • Factors such as the type of work being performed and the stability of th...read more

View 1 answer

Q4. What is inspected you before during and after welding ?

Ans.

Before, during, and after welding, various aspects are inspected to ensure quality and safety.

  • Before welding, the materials and equipment are inspected for cleanliness, proper setup, and suitability for the welding process.

  • During welding, the inspector checks for proper welding technique, adherence to welding procedures, and the quality of welds being produced.

  • After welding, the inspector inspects the completed welds for defects such as cracks, porosity, incomplete fusion, an...read more

View 1 answer
Discover null interview dos and don'ts from real experiences

Q5. How many times inspaction the scaffold.

Ans.

The scaffold should be inspected multiple times during its lifespan to ensure safety and compliance.

  • Scaffolds should be inspected before initial use to ensure proper assembly and stability.

  • Regular inspections should be conducted during the lifespan of the scaffold, especially after any modifications or adverse weather conditions.

  • Inspections should also be carried out after any incidents or accidents involving the scaffold.

  • Inspections should cover all components of the scaffol...read more

View 4 more answers

Q6. How many capacity have special duty scaffold.

Ans.

The capacity of special duty scaffolds varies depending on their design and purpose.

  • Special duty scaffolds are designed to support heavy loads or provide access to difficult areas.

  • The capacity of special duty scaffolds can range from a few hundred pounds to several thousand pounds.

  • Factors that determine the capacity include the type of scaffold, its materials, and the configuration.

  • For example, a heavy-duty steel scaffold may have a capacity of 10,000 pounds, while a lightwei...read more

View 1 answer
Are these interview questions helpful?

Q7. Brief about inspection starting from material receiving, surface preparation to final product acceptance?

Ans.

Inspection process starts from material receiving, surface preparation to final product acceptance.

  • Upon material receiving, inspect for damage or defects

  • Verify material specifications and certifications

  • Surface preparation involves cleaning, blasting, and coating application

  • Inspect coating thickness, adhesion, and appearance

  • Perform quality control tests and document results

  • Final product acceptance involves verifying compliance with project specifications

  • Ensure all documentatio...read more

Add your answer

Q8. How many tipe of scaffold.

Ans.

There are several types of scaffolds used in construction.

  • Supported scaffolds

  • Suspended scaffolds

  • Rolling scaffolds

  • Cantilever scaffolds

  • Mobile scaffolds

  • Trestle scaffolds

  • Tower scaffolds

  • Patented scaffolds

View 3 more answers
Share interview questions and help millions of jobseekers 🌟

Q9. How to inspected and released fabrication spool before send to erection site

Ans.

Fabrication spools must be inspected thoroughly before releasing to the erection site.

  • Check for any defects or damages on the spool.

  • Ensure that the spool meets the required specifications and standards.

  • Verify that all necessary documentation and certifications are in place.

  • Perform visual and dimensional inspections on the spool.

  • Conduct hydrostatic testing to check for leaks or other issues.

  • Ensure that the spool is properly labeled and identified.

  • Coordinate with other departme...read more

Add your answer

Q10. How much people going on mobile scaffold

Ans.

The number of people allowed on a mobile scaffold depends on its design and load capacity.

  • The maximum number of people allowed on a mobile scaffold should be specified by the manufacturer or in the scaffold's design documentation.

  • Factors such as the scaffold's dimensions, materials used, and load capacity determine the number of people it can safely accommodate.

  • It is important to follow the manufacturer's guidelines and any applicable regulations or standards when determining...read more

View 1 answer

Q11. Scaffolding eraction time which tag fixing.

Ans.

The time required for scaffolding erection and tag fixing.

  • The scaffolding erection time depends on various factors such as the size and complexity of the structure, the number of workers involved, and their experience.

  • Tag fixing refers to the process of attaching identification tags or labels to the scaffolding components for safety and compliance purposes.

  • The time taken for tag fixing can vary depending on the number of tags required and the efficiency of the workers.

  • It is i...read more

View 1 answer

Q12. How many bord use it hanging scaffold.

Ans.

The number of boards used in a hanging scaffold depends on the specific requirements of the project.

  • The number of boards used will vary based on the length and width of the scaffold.

  • The weight capacity of the scaffold will also determine the number of boards needed.

  • Additional boards may be required for safety measures, such as toe boards or guardrails.

  • The specific regulations and guidelines of the construction industry should be followed to determine the appropriate number of...read more

View 1 answer

Q13. How many days remove the scaffold.

Ans.

The number of days to remove a scaffold depends on various factors such as the size and complexity of the scaffold, weather conditions, and safety regulations.

  • The duration to remove a scaffold can range from a few hours to several days.

  • Factors like the height and size of the scaffold, the number of workers involved, and the complexity of the structure can affect the time required for removal.

  • Weather conditions, such as strong winds or rain, may delay the removal process for s...read more

View 2 more answers

Q14. How many lenth the scaffold tub

Ans.

The length of the scaffold tub varies depending on the specific requirements of the construction project.

  • The length of the scaffold tub can range from a few feet to several meters.

  • It is important to consider the height and width of the structure being built when determining the length of the scaffold tub.

  • The length of the scaffold tub may also be influenced by safety regulations and guidelines.

  • For example, if a scaffold is being used for painting a high ceiling, a longer tub ...read more

View 2 more answers

Q15. What you will in check RT films ? What is sensitivity calculation

Ans.

In RT film check, I will inspect for any defects or anomalies in the radiographic image. Sensitivity calculation is the measure of the smallest detectable flaw.

  • Inspect for any defects or anomalies in the radiographic image

  • Check for proper exposure and contrast

  • Ensure that the film is free from any artifacts or processing errors

  • Calculate the sensitivity of the film to detect the smallest flaw

  • Use a penetrameter to determine the sensitivity of the film

  • Compare the penetrameter ima...read more

Add your answer

Q16. What u will be check on time Ground Inspection or IMIR

Ans.

I will check both Ground Inspection and IMIR for quality control purposes.

  • I will check the ground inspection report for any discrepancies or issues with the physical product.

  • I will also review the IMIR (In-Process Material Inspection Report) to ensure that all necessary inspections and tests have been completed.

  • I will verify that all required documentation is present and accurate.

  • I will communicate any issues or concerns to the appropriate parties for resolution.

  • Examples of i...read more

Add your answer

Q17. Which code is to be used as per ASME for transportation of Hydro carbon Fluids as per ASME Sec VIII Div.1?

Ans.

ASME B31.3 is the code used for transportation of Hydrocarbon Fluids as per ASME Sec VIII Div.1.

  • ASME B31.3 code is used for transportation of Hydrocarbon Fluids

  • ASME Sec VIII Div.1 is for pressure vessels, not transportation

  • Examples: ASME B31.3 code is used for pipelines carrying hydrocarbon fluids

Add your answer

Q18. Have you so many skill, you will utilise that at site?

Ans.

Yes, I have a wide range of skills that I can utilize at the surveying site.

  • I have expertise in using various surveying instruments such as total stations, GPS receivers, and laser scanners.

  • I am proficient in data collection, analysis, and interpretation.

  • I have strong mathematical and analytical skills, which are essential for accurate measurements and calculations.

  • I am knowledgeable in land surveying laws, regulations, and standards.

  • I have excellent communication and teamwor...read more

View 1 answer

Q19. How much thignes tub use in scaffold

Ans.

The amount of things to use in a scaffold depends on the specific requirements of the project.

  • The number of things to use in a scaffold will vary depending on the height and size of the scaffold.

  • The weight capacity of the scaffold should also be considered when determining the number of things to use.

  • Local regulations and safety standards may dictate the minimum number of things required for a scaffold.

  • Examples of things used in a scaffold include tubes, couplers, boards, and...read more

View 1 answer

Q20. How many tips tie used in scaffolding

Ans.

The number of tie used in scaffolding varies depending on the height and complexity of the structure.

  • The number of ties used in scaffolding is determined by the height and complexity of the structure.

  • Ties are used to provide stability and prevent the scaffolding from swaying or collapsing.

  • The general rule is to have a minimum of one tie for every 4 meters of scaffolding height.

  • Additional ties may be required at corners, intersections, and other areas where extra support is ne...read more

View 1 answer

Q21. How many degrees used the ladder

Ans.

The ladder used for scaffolding typically has an angle of 75 degrees.

  • The ladder used for scaffolding is usually set at a specific angle to ensure stability and safety.

  • The most common angle for a scaffolding ladder is 75 degrees.

  • This angle provides a good balance between ease of climbing and stability.

  • Using a ladder with the correct angle is important to prevent accidents and ensure the safety of workers.

View 1 answer

Q22. Scaffolding tube iner daya how much.

Ans.

The inner diameter of a scaffolding tube varies depending on the specific type and manufacturer.

  • The inner diameter of a scaffolding tube can range from 26mm to 40mm.

  • Different countries may have different standards for scaffolding tube inner diameter.

  • The inner diameter of a scaffolding tube affects its load-bearing capacity and stability.

  • It is important to consult the manufacturer's specifications or industry standards for accurate information on scaffolding tube inner diamete...read more

View 1 answer

Q23. 6miter ladder how much place tie

Ans.

The 6-meter ladder requires a certain amount of space to be tied securely.

  • The amount of space required to tie a 6-meter ladder depends on the specific regulations and guidelines of the scaffolding industry.

  • Generally, a 6-meter ladder should be tied at a distance of 1 meter from the top support point.

  • The ladder should also be tied at a distance of 4 meters from the bottom support point.

  • These distances ensure stability and prevent the ladder from slipping or falling during use.

View 1 answer

Q24. Which NDT is used to measure sub surface defects below 12mm?

Ans.

Ultrasonic Testing (UT) is used to measure sub surface defects below 12mm.

  • Ultrasonic Testing (UT) is a non-destructive testing method that uses high frequency sound waves to detect internal flaws in materials.

  • UT is commonly used in industries such as aerospace, automotive, and manufacturing to inspect for defects like cracks, voids, and inclusions.

  • The technique is effective for detecting sub surface defects as it can penetrate materials and provide detailed information about ...read more

Add your answer

Q25. Why do you consider this compnay a better option than the previous one.

Ans.

This company offers better growth opportunities, work-life balance, and benefits compared to the previous one.

  • The company has a clear career progression path with opportunities for advancement.

  • The company values work-life balance and offers flexible working arrangements.

  • The company provides better benefits such as healthcare coverage, retirement plans, and employee perks.

  • The company has a positive company culture and values employee well-being.

  • The company invests in employee ...read more

Add your answer

Q26. What do you know about holiday inspection??

Ans.

Holiday inspection is a process of detecting and repairing coating defects.

  • It involves inspecting a coated surface for any defects or holidays.

  • Defects can include pinholes, cracks, or thin spots in the coating.

  • The inspector uses various tools such as a holiday detector to locate any defects.

  • Once defects are found, they are repaired by filling in the area with additional coating material.

  • Holiday inspection is important to ensure the coating is effective in protecting the surfa...read more

Add your answer

Q27. What is the hydrotest pressure of vessel, as MAWP=1MPa?

Ans.

The hydrotest pressure of a vessel with MAWP=1MPa is typically 1.5 times the MAWP.

  • Hydrotest pressure is usually 1.5 times the MAWP (Maximum Allowable Working Pressure)

  • For MAWP=1MPa, the hydrotest pressure would be 1.5 MPa

  • Hydrotest pressure ensures the vessel's structural integrity under pressure

Add your answer

Q28. Mobile scaffold has been used for

Ans.

Mobile scaffold has been used for various purposes in construction and maintenance work.

  • Providing a safe working platform at elevated heights

  • Facilitating access to hard-to-reach areas

  • Supporting workers and materials during construction or maintenance tasks

  • Allowing for easy movement and repositioning on site

  • Enhancing productivity and efficiency in work processes

View 1 answer

Q29. What is your current Cost to Company (CTC), including any variable components?

Add your answer

Q30. How much gap required in fit-up of pipes.?

Ans.

The gap required in fit-up of pipes depends on the welding process and material being used.

  • The gap for TIG welding is typically 1/16 to 1/8 inch.

  • For MIG welding, the gap can be slightly larger, around 3/32 to 1/8 inch.

  • The gap should be uniform along the entire length of the joint for proper welding.

  • The material being welded also influences the gap size, with thicker materials requiring larger gaps.

View 1 answer

Q31. What u will check at during spool erection time

Ans.

During spool erection time, I will check for proper alignment, fit-up, welding quality, and dimensional accuracy.

  • Check for proper alignment of spool components

  • Ensure fit-up is correct and there are no gaps or misalignments

  • Inspect welding quality for defects such as cracks, porosity, and incomplete fusion

  • Verify dimensional accuracy of the spool according to the design specifications

  • Check for any damage or corrosion on the spool components

Add your answer

Q32. Types of material, Codes, Sections and various products

Ans.

As a Field Inspector, I am familiar with various types of materials, codes, sections, and products used in construction.

  • Materials: concrete, steel, wood, asphalt, etc.

  • Codes: International Building Code (IBC), National Electrical Code (NEC), etc.

  • Sections: foundation, framing, roofing, etc.

  • Products: HVAC systems, plumbing fixtures, electrical components, etc.

View 1 answer

Q33. What are accounting concepts and principles?

Ans.

Accounting concepts and principles are the foundational guidelines for the preparation and presentation of financial statements.

  • Accounting concepts are basic assumptions, rules, and guidelines that underlie the preparation of financial statements.

  • Accounting principles are the rules and guidelines that companies must follow when reporting financial data.

  • Examples of accounting concepts include going concern, consistency, and materiality.

  • Examples of accounting principles include...read more

Add your answer

Q34. Which instrument used for Surface preparation?

Ans.

The instrument used for surface preparation is a sandblaster.

  • Sandblaster is commonly used for surface preparation in industries like construction, automotive, and shipbuilding.

  • It uses compressed air to propel abrasive material at high velocity to smooth out rough surfaces or remove contaminants.

  • Examples of abrasive materials used in sandblasters include sand, garnet, and glass beads.

Add your answer

Q35. Which Film is used for radiography testing?

Ans.

X-ray film is commonly used for radiography testing.

  • X-ray film is sensitive to X-ray radiation and produces an image when exposed.

  • The film is placed behind the object being tested and exposed to X-rays.

  • After exposure, the film is developed to reveal any defects or abnormalities.

  • Common types of X-ray film include industrial radiographic film and medical radiographic film.

Add your answer

Q36. What is difference between pipe and tube?

Ans.

Pipe is measured by its inner diameter, while tube is measured by its outer diameter.

  • Pipe is used to transport fluids or gases, while tube is often used for structural applications.

  • Pipe is typically manufactured to specific industry standards, while tube may have more varied dimensions and tolerances.

  • Examples: PVC pipe for plumbing, steel tube for construction.

Add your answer

Q37. Brief your experience in insulation and fire proofing??

Ans.

I have extensive experience in insulation and fireproofing, having worked on various projects in the past.

  • I have worked on insulation projects for both commercial and residential buildings.

  • I am familiar with different types of insulation materials such as fiberglass, cellulose, and foam.

  • I have also worked on fireproofing projects for industrial facilities such as oil refineries and chemical plants.

  • I am knowledgeable in fireproofing materials such as intumescent coatings and c...read more

Add your answer

Q38. Brief your experience in coating survey??

Ans.

I have extensive experience in coating survey, including surface preparation, application, and inspection.

  • Conducted coating surveys on various structures such as pipelines, tanks, and bridges

  • Evaluated surface preparation methods and ensured compliance with industry standards

  • Monitored coating application and inspected for defects such as holidays and pinholes

  • Maintained detailed records and reports of coating surveys

  • Collaborated with project managers and contractors to ensure t...read more

Add your answer

Q39. What are the methods of Non-Destructive Testing (NDT)?

Add your answer

Q40. What is IQI in radiography testing

Ans.

IQI stands for Image Quality Indicator, used in radiography testing to ensure the quality of the radiographic image.

  • IQI is a tool used to determine the quality of radiographic images by measuring the image quality parameters such as contrast, resolution, and sensitivity.

  • It consists of a series of patterns or objects with specific details that are placed on the radiographic film along with the test object.

  • The IQI is then exposed to the same conditions as the test object to eva...read more

View 1 answer

Q41. Inspection activities of heat exchanger column pressure vessel. Material of construction of process equipments.heat treatment process.

Ans.

Inspection activities of heat exchanger column pressure vessel and material of construction and heat treatment process.

  • Inspection activities for heat exchanger column pressure vessel include visual inspection, thickness measurements, and non-destructive testing.

  • Common materials of construction for process equipment include carbon steel, stainless steel, and aluminum.

  • Heat treatment processes for process equipment may include annealing, quenching, and tempering.

  • Proper documenta...read more

Add your answer

Q42. How to handle when there is heavy work load on you.

Ans.

Prioritize tasks, delegate when possible, communicate with team, take breaks to avoid burnout.

  • Prioritize tasks based on deadlines and importance.

  • Delegate tasks to team members if possible.

  • Communicate with team and supervisor about workload.

  • Take short breaks to avoid burnout and maintain productivity.

Add your answer

Q43. What are the procedures for soil testing?

Add your answer

Q44. What is hydro test procedures?

Ans.

Hydro test procedures involve filling a vessel or pipeline with water and pressurizing it to check for leaks or structural integrity.

  • The vessel or pipeline is filled with water

  • The water is pressurized to a predetermined level

  • The pressure is held for a specified amount of time

  • The vessel or pipeline is inspected for leaks or structural damage

  • If no issues are found, the water is drained and the vessel or pipeline is deemed safe for use

  • Examples include testing the integrity of a ...read more

Add your answer

Q45. How to Manage your Safety System in Site ?

Ans.

Managing safety system in site requires a comprehensive approach to identify, assess, and control hazards.

  • Develop and implement a safety management system

  • Conduct regular safety audits and inspections

  • Provide safety training and education to employees

  • Establish emergency response procedures

  • Encourage employee involvement in safety programs

  • Maintain accurate records of safety incidents and near misses

Add your answer

Q46. What is the role of bureau Veritas and why do we test materials

Ans.

Bureau Veritas is a testing, inspection, and certification company that ensures materials meet quality and safety standards.

  • Bureau Veritas plays a crucial role in testing materials to ensure they meet quality and safety standards.

  • They provide certification services to industries such as construction, oil and gas, automotive, and consumer products.

  • Testing materials helps in ensuring compliance with regulations and standards, reducing risks of product failures and recalls.

  • Examp...read more

Add your answer

Q47. What are the types of welding?

Ans.

Types of welding include arc welding, gas welding, resistance welding, and laser welding.

  • Arc welding: uses an electric arc to melt and join metals, such as MIG welding and TIG welding

  • Gas welding: uses a gas flame to melt and join metals, such as oxyacetylene welding

  • Resistance welding: uses electric resistance to generate heat and join metals, such as spot welding

  • Laser welding: uses a high-powered laser beam to melt and join metals

Add your answer

Q48. What is Procedure Cube test of concrete as per Grad M10,15,20,25

Ans.

Cube test is conducted to determine the compressive strength of concrete for different grades like M10, M15, M20, M25.

  • Prepare the concrete mix as per the design mix proportions for the respective grade (M10, M15, M20, M25).

  • Fill the concrete in cube molds of standard size and compact it properly using a tamping rod.

  • After 24 hours, demold the cubes and cure them in water for 7 or 28 days depending on the grade.

  • Place the cubes in a compression testing machine and apply load grad...read more

Add your answer

Q49. Able To Travel Daily Basis And How Far You Can Contribution In This Orgnisation

Ans.

Yes, I am able to travel daily and contribute significantly to the organization.

  • I am willing to travel daily for work and have reliable transportation.

  • I am flexible with my schedule and can adjust to meet the needs of the organization.

  • I have experience working in fast-paced environments that require daily travel, such as previous contract officer roles.

  • I am committed to making a positive impact and contributing effectively to the organization through my work.

Add your answer

Q50. What will be my amount if I share my views?

Ans.

Sharing your views is not related to monetary compensation.

  • Sharing your views is not a paid activity.

  • Your compensation will be based on your job role and company policies.

  • However, sharing your views can help improve the work environment and safety measures.

  • Your views can also contribute to the overall success of the company.

Add your answer

Q51. What is ISO ? What is the importance of ISO?

Ans.

ISO stands for International Organization for Standardization. It is a non-governmental organization that develops and publishes standards for various industries.

  • ISO provides a framework for organizations to ensure that their products and services meet the required quality, safety, and environmental standards.

  • ISO certification is often a requirement for businesses to participate in global trade.

  • ISO standards cover a wide range of industries, including manufacturing, healthcar...read more

Add your answer

Q52. What are operational controls?

Ans.

Operational controls are measures taken to reduce or eliminate hazards in the workplace.

  • Operational controls are a type of risk control measure.

  • They involve modifying work processes or procedures to reduce the likelihood of accidents or injuries.

  • Examples include machine guarding, lockout/tagout procedures, and personal protective equipment.

  • Operational controls should be regularly reviewed and updated to ensure their effectiveness.

  • They are an important part of an overall safet...read more

Add your answer

Q53. Documentation line for ISO 14001 & 45001

Ans.

Documentation for ISO 14001 & 45001 includes policies, procedures, manuals, records, and forms.

  • Policies outline the organization's commitment to environmental and occupational health and safety management.

  • Procedures provide step-by-step instructions for implementing policies.

  • Manuals provide guidance on how to manage environmental and occupational health and safety aspects.

  • Records document the organization's performance and compliance with ISO standards.

  • Forms are used to colle...read more

Add your answer

Q54. Tell any five IS codes

Ans.

Five important IS codes related to inspection engineering

  • IS 456: Code of practice for plain and reinforced concrete

  • IS 3370: Code of practice for concrete structures for storage of liquids

  • IS 800: Code of practice for general construction in steel

  • IS 1893: Criteria for earthquake resistant design of structures

  • IS 875: Code of practice for design loads for buildings and structures

Add your answer

Q55. Design of 3 floor building?

Ans.

Designing a 3-floor building involves considering structural stability, functionality, and aesthetics.

  • Start by determining the purpose of the building and its layout requirements.

  • Consider the load-bearing capacity of the structure and ensure proper foundation design.

  • Plan the floor layout, including rooms, corridors, and staircases.

  • Incorporate safety measures like fire exits and emergency evacuation routes.

  • Choose suitable materials for construction, considering durability and ...read more

Add your answer

Q56. What different codes do you know about,

Ans.

I am familiar with HTML, CSS, JavaScript, Python, Java, C++, SQL, and more.

  • HTML

  • CSS

  • JavaScript

  • Python

  • Java

  • C++

  • SQL

Add your answer

Q57. What is BIS stand for?

Ans.

BIS stands for Bureau of Indian Standards.

  • BIS is the national standards body of India.

  • It develops and publishes standards for various products and services.

  • Examples of BIS standards include IS 456 for concrete and IS 2062 for steel.

Add your answer

Q58. What us ISO stand for?

Ans.

ISO stands for International Organization for Standardization.

  • ISO is a non-governmental organization that develops and publishes international standards.

  • It ensures products and services are safe, reliable, and of good quality.

  • Examples of ISO standards include ISO 9001 for quality management and ISO 14001 for environmental management.

Add your answer

Q59. Wat was the high rating for greyscale??

Ans.

The high rating for greyscale is typically 255.

  • The high rating for greyscale refers to the maximum value in a greyscale image, which is usually 255.

  • This value represents pure white in the image.

  • In a greyscale image, each pixel is assigned a value between 0 (black) and 255 (white).

View 1 answer

Q60. How to deal work life balance

Ans.

Maintaining work-life balance involves setting boundaries, prioritizing self-care, and practicing time management.

  • Set boundaries by establishing designated work hours and sticking to them

  • Prioritize self-care by making time for activities that bring you joy and relaxation

  • Practice time management by creating to-do lists and scheduling breaks throughout the day

Add your answer

Q61. What is ofi, observation

Ans.

OFI stands for Opportunities for Improvement, while observation refers to findings noted during an audit.

  • OFI (Opportunities for Improvement) are suggestions for enhancing processes or systems

  • Observations are notes made during an audit regarding non-conformities or areas for improvement

  • Both OFIs and observations are documented in audit reports for further action

  • Examples: OFI - Implementing a new software system for better data management. Observation - Lack of training for emp...read more

View 1 answer

Q62. What is OMS

Ans.

OMS stands for Operations Management System, a software system used to manage and optimize business operations.

  • OMS helps in planning, scheduling, and tracking of operations

  • It provides real-time data and analytics for decision-making

  • OMS can be used in various industries such as manufacturing, logistics, and healthcare

  • Examples of OMS include SAP, Oracle, and Microsoft Dynamics

Add your answer

Q63. Quality standards for the products.

Ans.

Quality standards for products ensure consistency, reliability, and customer satisfaction.

  • Quality standards define the criteria and specifications that products must meet.

  • They ensure that products are safe, reliable, and perform as intended.

  • Standards may include ISO certifications, industry-specific regulations, and customer requirements.

  • Quality control processes and inspections are implemented to ensure adherence to standards.

  • Examples of quality standards include ISO 9001 fo...read more

Add your answer

Q64. Explain in detail in depth.

Ans.

The question requires a detailed and in-depth explanation of a specific topic or concept related to quantity surveying.

  • Start by providing a comprehensive overview of the topic being discussed

  • Break down the key components or processes involved in the topic

  • Include relevant examples or case studies to illustrate your points

  • Discuss any challenges or considerations that may arise in relation to the topic

  • Conclude by summarizing the importance or impact of the topic in the field of ...read more

Add your answer

Q65. Tensile testing procedure

Add your answer

More about working at Bureau Veritas

HQ - Paris La Défense, Hauts-de-Seine, France
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at null

based on 37 interviews in the last 1 year
Interview experience
3.7
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.9
 • 700 Interview Questions
4.0
 • 683 Interview Questions
4.0
 • 596 Interview Questions
3.5
 • 299 Interview Questions
3.4
 • 159 Interview Questions
4.1
 • 152 Interview Questions
View all
Top Bureau Veritas Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter