i
Belrise Industries
Filter interviews by
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed in Aug 2018. There were 2 interview rounds.
Process knowledge & Drawing point.
Cp measures process capability, while Cpk measures process capability adjusted for centering.
Cp only considers the spread of data, while Cpk takes into account both spread and centering of data.
Cp assumes the process is centered within the specification limits, while Cpk adjusts for any deviation from the center.
If Cp is greater than Cpk, it indicates that the process is not centered within the specification limits.
For...
Quality statgy improvement study
Customer handling and management handling
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Sep 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
The 7QC tools are a set of quality control tools used in process improvement. There are 7 tools in total.
The 7QC tools are: Pareto Chart, Cause and Effect Diagram, Check Sheet, Histogram, Scatter Diagram, Control Chart, and Flowchart.
These tools are used to identify, analyze, and solve quality-related problems in various processes.
Each tool serves a specific purpose, such as identifying the most significant issues (Par...
MSA stands for Measurement System Analysis. There are two types of MSA studies: Attribute Agreement Analysis and Variable Gauge R&R Study.
MSA is a method used to assess the measurement system's capability to provide accurate and reliable data.
Attribute Agreement Analysis is used when the measurement system classifies items into categories.
Variable Gauge R&R Study is used when the measurement system provides numerical m...
MSA study criteria refers to the guidelines and requirements for conducting a Measurement System Analysis.
MSA study criteria outline the steps and procedures for evaluating the measurement system used in a process.
It includes criteria for selecting appropriate measurement tools and techniques.
The criteria define the acceptable levels of accuracy, precision, linearity, and stability for the measurement system.
It also in...
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consultant
QMS stands for Quality Management System and TPM stands for Total Productive Maintenance System.
QMS is a set of policies, processes, and procedures required for planning and execution of quality control.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
QMS focuses on meeting customer requirements and improving customer satisfaction.
TPM focuses on improving equipment reliab...
based on 1 interview
Interview experience
Junior Engineer
405
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Production Engineer
303
salaries
| ₹1.6 L/yr - ₹5.2 L/yr |
Quality Engineer
283
salaries
| ₹1.3 L/yr - ₹4.8 L/yr |
Engineer
245
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
220
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Krishna Maruti
Faurecia