Filter interviews by
I applied via Referral and was interviewed in Feb 2022. There were 3 interview rounds.
Basic aptitude questions including core engineering questions
To explore new opportunities and challenges
Desire to learn new skills and gain diverse experience
Seeking better career growth prospects
Interest in a different industry or technology
Personal or professional reasons
Example: From software development to production engineering
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jul 2021. There was 1 interview round.
posted on 13 Nov 2021
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Dec 2021. There were 2 interview rounds.
Maintain production quantity and quality output by optimizing processes, training employees, and monitoring performance.
Regularly review and optimize production processes to eliminate inefficiencies and reduce waste.
Provide ongoing training and development opportunities for employees to improve their skills and knowledge.
Implement quality control measures to ensure that products meet or exceed customer expectations.
Mon...
Mathamatics resoning
I applied via Approached by Company and was interviewed in Dec 2021. There were 2 interview rounds.
To become a senior production engineer and contribute to the growth and success of the company.
Continuously improve technical skills and knowledge in production engineering
Take on leadership roles and mentor junior engineers
Implement innovative solutions to optimize production processes
Collaborate with cross-functional teams to drive efficiency and quality
Contribute to the development and implementation of long-term pr
To improve the plan growth, I would focus on optimizing production processes, implementing efficient resource allocation, and continuously monitoring and analyzing performance.
Optimize production processes to increase efficiency and reduce waste
Implement efficient resource allocation to ensure optimal utilization
Continuously monitor and analyze performance to identify areas for improvement
Invest in research and develop...
To make changes in the shop floor, I would follow a systematic approach involving planning, communication, implementation, and evaluation.
Develop a clear plan outlining the desired changes and objectives
Communicate the proposed changes to the shop floor employees and stakeholders
Implement the changes gradually, ensuring proper training and support
Regularly evaluate the effectiveness of the changes and make necessary ad...
To improve quality, focus on process optimization, employee training, and customer feedback.
Implement quality control measures at each stage of production
Regularly train employees on quality standards and best practices
Encourage open communication with customers to gather feedback and address issues
Analyze data and metrics to identify areas for improvement
Implement continuous improvement initiatives like Six Sigma or L
I applied via AmbitionBox
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
My favorite subject is mechanical engineering.
I enjoy studying the principles of mechanics and how they apply to real-world applications.
I find the design and analysis of machines and systems fascinating.
I have a strong interest in thermodynamics and fluid mechanics.
I have taken courses in materials science and manufacturing processes.
I have hands-on experience with CAD software and machine shop tools.
I applied via Walk-in and was interviewed in Oct 2022. There were 3 interview rounds.
Overall Equipment Effectiveness (OEE) is a measure of how effectively equipment is being utilized to produce quality products.
OEE is calculated by multiplying availability, performance, and quality rates.
Availability rate measures the percentage of time the equipment is available for production.
Performance rate measures the speed at which the equipment is producing products compared to its maximum capacity.
Quality rate...
Improved production efficiency by implementing new processes and reducing downtime.
Implemented a new scheduling system that reduced production downtime by 20%
Developed and implemented a preventive maintenance program that reduced equipment breakdowns by 15%
Led a team in optimizing production line layout, resulting in a 10% increase in overall efficiency
Streamlined inventory management processes, reducing waste and impr...
High pressure die casting is a metal casting process in which molten metal is injected into a mold cavity under high pressure.
Molten metal is injected into a mold cavity under high pressure
The mold is made of two halves and is designed to create a specific shape
The process is used to create complex shapes with high accuracy and surface finish
Commonly used for manufacturing automotive parts, aerospace components, and co
Cycle time is the time taken to complete a task while takt time is the time available to complete a task.
Cycle time is the total time taken to complete a process, including both processing and waiting time.
Takt time is the rate at which a product must be produced to meet customer demand.
Cycle time should be less than or equal to takt time to meet customer demand.
For example, if a company has a takt time of 60 seconds a...
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired my interest in the field.
I have two siblings, one of whom is a doctor, which has given me exposure to the medical field.
My grandparents were farmers, teaching me the importance of hard work and problem-solving.
My family has always encouraged education and supported my career aspirations.
based on 8 reviews
Rating in categories
Senior Engineer
44
salaries
| ₹4 L/yr - ₹7.7 L/yr |
Assistant Manager
43
salaries
| ₹5 L/yr - ₹8.3 L/yr |
Engineer
37
salaries
| ₹3.7 L/yr - ₹6 L/yr |
Production Engineer
23
salaries
| ₹2.4 L/yr - ₹5.3 L/yr |
Quality Engineer
20
salaries
| ₹1.5 L/yr - ₹4.9 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda