There are 7 types of losses in production.
The 7 types of losses are: overproduction, waiting, transportation, processing, motion, inventory, and defects.
Overproduction is producing more than what is needed.
Waiting is the time spent waiting for the next step in the production process.
Transportation is the movement of goods or materials between processes.
Processing is the time spent on actual production.
Motion is the tim...
posted on 23 Nov 2019
I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.
posted on 6 May 2019
I was interviewed in May 2019.
There are several types of bricks used in construction, including clay bricks, concrete bricks, and fire bricks.
Clay bricks are the most common type of brick used in construction.
Concrete bricks are made from cement, sand, and water and are used for their strength and durability.
Fire bricks are designed to withstand high temperatures and are used in fireplaces, ovens, and kilns.
Other types of bricks include sand-lime b...
I applied via Walk-in and was interviewed before Jul 2020. There were 3 interview rounds.
posted on 22 Jul 2021
I applied via Indeed and was interviewed in Jun 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Power supply is an electronic device that provides electrical energy to an electrical load.
Power supply converts AC voltage to DC voltage.
It regulates voltage and current to protect the device from damage.
Types of power supply include linear, switching, and battery.
Examples of power supply include wall adapters, computer power supplies, and batteries.
posted on 14 Nov 2019
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.
I want to join this company because of its innovative projects and strong reputation in the industry.
Impressed by the company's cutting-edge technology and solutions
Excited about the opportunity to work with a talented team
Interested in the company's commitment to professional growth and development
based on 1 interview
Interview experience
Junior Engineer
140
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Electronics
Honeywell Automation
Siemens
Schneider Electric