Filter interviews by
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
An induction motor is an AC electric motor in which the electric current in the rotor is produced by electromagnetic induction from the magnetic field of the stator winding.
Induction motors are widely used in various applications such as pumps, fans, compressors, and conveyors.
They are efficient, reliable, and require low maintenance.
The working principle of an induction motor involves the interaction between the magne...
A starter is an electrical device used to start and control the speed of an electric motor.
It is used to control the flow of current to the motor
It helps in reducing the starting current of the motor
There are different types of starters such as direct-on-line starter, star-delta starter, and soft starter
Various measurements units are used in power systems for different parameters.
Voltage is measured in volts (V)
Current is measured in amperes (A)
Power is measured in watts (W)
Frequency is measured in hertz (Hz)
Energy is measured in joules (J) or kilowatt-hours (kWh)
Power factor is measured in a ratio or percentage
Impedance is measured in ohms (Ω)
Top trending discussions
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
M25 concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M25 concrete is commonly used in construction projects.
It is a mix of cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement to sand to coarse aggregates in M25 concrete is 1:1:2.
The compressive strength of M25 concrete is achieved after 28 days of curing.
M25 concrete is suitable for various applications such as
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Grade of concrete at site refers to the strength of the concrete mix used in construction.
Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.
Common grades of concrete include M20, M25, M30, etc.
Higher grade concrete indicates higher strength and durability.
The grade of concrete is determined by the mix design and testing of samples.
For example, M25 grade concrete has a compressiv
posted on 12 Oct 2021
posted on 24 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
Commercial buildings serve business needs, while residential buildings provide living spaces for individuals and families.
Commercial buildings include offices, retail stores, and warehouses.
Examples of commercial buildings: shopping malls, corporate offices, and hotels.
Residential buildings encompass single-family homes, apartments, and condominiums.
Examples of residential buildings: townhouses, duplexes, and high-rise
Load calculations determine the electrical demand of a system for efficient design and safety.
1. Residential Load Calculation: Includes lighting, appliances, HVAC systems. Example: Calculating total wattage for a home.
2. Commercial Load Calculation: Considers office equipment, lighting, and HVAC. Example: Estimating load for a retail store.
3. Industrial Load Calculation: Involves motors, machinery, and specialized equi...
based on 1 review
Rating in categories
Civil Site Engineer
4
salaries
| ₹2 L/yr - ₹2.4 L/yr |
Computer Operator
3
salaries
| ₹2.4 L/yr - ₹2.4 L/yr |
Customer Support Executive
3
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Shift Incharge
3
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Civil Engineer
3
salaries
| ₹1 L/yr - ₹3.6 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures