Filter interviews by
Clear (1)
I applied via Referral and was interviewed before Jul 2020. There were 4 interview rounds.
The average debt:equity ratio for electricity transactions varies depending on the type of transaction and the risk involved.
The debt:equity ratio for electricity transactions can range from 1:1 to 4:1.
The ratio is influenced by factors such as the size of the transaction, the creditworthiness of the parties involved, and the regulatory environment.
For example, a project finance transaction for a renewable energy proje...
Remedies for force majeure and change in law events
Force majeure: suspension of obligations, renegotiation, termination, damages
Change in law: renegotiation, termination, damages
Force majeure and change in law clauses in contracts
Insurance policies may cover force majeure events
Litigation as a last resort
To obtain an electricity trading license from CERC, one can apply online through the CERC portal.
Visit the CERC website and create an account
Fill out the application form and attach the required documents
Pay the application fee online
Submit the application and wait for approval
Once approved, pay the license fee and obtain the license
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Different practical situation for handling the situation
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.
Some of the top questions asked at the AmpIn Energy Transition Legal Manager interview -
Senior Associate
16
salaries
| ₹8.4 L/yr - ₹23 L/yr |
Company Secretary
11
salaries
| ₹6 L/yr - ₹16.9 L/yr |
Associate General Manager
8
salaries
| ₹18 L/yr - ₹35 L/yr |
Associate
8
salaries
| ₹7 L/yr - ₹16.2 L/yr |
Assistant General Manager
7
salaries
| ₹16.7 L/yr - ₹34 L/yr |
Tata Power
Adani Green Energy
Suzlon Group
ReNew