i
Amp Motors
Filter interviews by
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Production planning involves creating a detailed plan for manufacturing products efficiently. 5S and Kaizen are methodologies used to improve productivity and efficiency in production.
Production planning involves setting goals, determining resources needed, creating schedules, and monitoring progress.
5S is a methodology focused on organizing the workplace to improve efficiency and eliminate waste. It stands for Sort, S...
5S and Kaizen are lean manufacturing methodologies focused on organization, efficiency, continuous improvement, and production planning.
5S is a methodology for organizing a workplace to improve efficiency and effectiveness by eliminating waste and maintaining cleanliness and order.
Kaizen is a philosophy of continuous improvement involving all employees in the organization to make small, incremental changes in processes...
Production is the process of creating goods or services using resources such as labor, machinery, and materials.
Production involves converting raw materials into finished products.
It includes activities such as manufacturing, assembling, packaging, and quality control.
Efficient production processes can lead to cost savings and increased output.
Examples of production include car manufacturing, food processing, and cloth
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
Top trending discussions
posted on 3 Dec 2024
What is the group decisions
I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 2 Dec 2021
I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 17 May 2022
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please clarify the question
I'm not sure what you mean by 'person shelf'
Could you provide more context or information?
posted on 6 May 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
I was interviewed in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the
posted on 2 Dec 2021
I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 21 May 2022
I applied via Company Website
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Engineer
38
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Production Engineer
31
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Quality Engineer
19
salaries
| ₹2.4 L/yr - ₹3.9 L/yr |
Senior Engineer
16
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Assistant Manager
15
salaries
| ₹4 L/yr - ₹8.7 L/yr |
Mahindra Last Mile Mobility
Tata Motors
Hero Electric
Ola Electric Mobility