Filter interviews by
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Three members taken by interview
Top trending discussions
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 19 Sep 2023
I applied via Referral
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
Safety Officer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Fireman
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Fire & Safety Supervisor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Supervisor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Marshal
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Firepro Systems
Ceasefire Industries
Tyco Fire & Security
Honeywell International India