Filter interviews by
PIU stands for Performance Improvement Unit.
PIU is a department or team within an organization that focuses on improving performance and efficiency.
It is responsible for identifying areas of improvement, developing strategies, and implementing changes.
PIU may use various tools and methodologies such as Lean Six Sigma, process mapping, and data analysis.
Examples of PIU initiatives include reducing customer wait times, s...
Managing spare parts involves inventory control, forecasting, and efficient allocation.
Implement a robust inventory management system to track spare parts.
Analyze historical data and forecast demand to ensure adequate stock levels.
Establish a system for categorizing and organizing spare parts for easy retrieval.
Regularly review and update inventory to identify obsolete or excess parts.
Develop relationships with reliabl...
To manage technicians effectively, establish clear expectations, provide ongoing training and support, foster open communication, recognize and reward achievements, and address performance issues promptly.
Establish clear expectations and goals for technicians, outlining their roles and responsibilities.
Provide ongoing training and support to ensure technicians have the necessary skills and knowledge to perform their jo...
KRA stands for Key Result Area. It is a set of measurable goals and objectives that define the success of a Service Manager.
KRA is used to evaluate the performance and effectiveness of a Service Manager.
It helps in setting clear expectations and aligning them with organizational goals.
Examples of KRA for a Service Manager may include customer satisfaction, service quality, team productivity, and revenue generation.
KRA ...
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
based on 3 reviews
Rating in categories
Assistant Manager
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
125
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
Thermax Limited
Waaree Energies
Hero Future Energies