Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ACE Group Team. If you also belong to the team, you can get access from here

ACE Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ACE Group Software Engineer Interview Questions and Answers

Updated 4 Mar 2024

ACE Group Software Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Given one task related programming
  • Q2. Data entry and display in grid view with insertion sensation and updating
  • Ans. 

    Data entry and display in grid view with insertion sensation and updating

    • Use a grid view component to display data in a tabular format

    • Implement data entry functionality to allow users to input new data

    • Include insertion sensation animations to provide visual feedback when adding new data

    • Implement updating functionality to allow users to edit existing data in the grid view

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Coding Test 

Python Intermediate level questions related to dictionary and lists.

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong coding knowledge is required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Asked basics aptitude qns(profit loss,percentage)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About Binary search
Round 2 - Technical 

(1 Question)

  • Q1. About project and ER diagram
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Easy Lettcode questions multiple

Round 3 - One-on-one 

(1 Question)

  • Q1. Lld round with java
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. JavaScript question
Round 2 - Technical 

(1 Question)

  • Q1. Coding questions

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 1.Social Media integration , Coroutne, RXJava Operators, MVVM, Jetpack,Room DB,Java Basics

Interview Preparation Tips

Interview preparation tips for other job seekers - You should have good communications skill, The interview is not that hard just brush up your basics.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations

ACE Group Interview FAQs

How many rounds are there in ACE Group Software Engineer interview?
ACE Group interview process usually has 1 rounds. The most common rounds in the ACE Group interview process are Technical.
What are the top questions asked in ACE Group Software Engineer interview?

Some of the top questions asked at the ACE Group Software Engineer interview -

  1. Data entry and display in grid view with insertion sensation and updat...read more
  2. Given one task related programm...read more

Tell us how to improve this page.

ACE Group Software Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Manager
14 salaries
unlock blur

₹4.3 L/yr - ₹15.5 L/yr

Assistant Manager
13 salaries
unlock blur

₹4.2 L/yr - ₹7.2 L/yr

Site Engineer
13 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Sales Manager
11 salaries
unlock blur

₹4 L/yr - ₹9.6 L/yr

Explore more salaries
Compare ACE Group with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview