i
ABB
Filter interviews by
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 5 interview rounds.
posted on 29 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There were 4 interview rounds.
Information about the project
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
posted on 25 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
I applied via Job Fair and was interviewed in Feb 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
My gd topic was Big data
I applied via Campus Placement and was interviewed before May 2023. There were 3 interview rounds.
MCQ of programming languages - c/c++/Python , basic DS and OS questions
I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.
This includes data interpretation,games,paragraph based question in verbal ability and the time is 30 mins
A linked list is a data structure where each element points to the next element in the sequence.
Consists of nodes connected by pointers
Can be singly linked (each node points to the next) or doubly linked (each node points to the next and previous)
Allows for dynamic size and efficient insertion/deletion operations
based on 1 review
Rating in categories
Project Engineer
594
salaries
| ₹5 L/yr - ₹18.3 L/yr |
R&D Engineer
328
salaries
| ₹7.5 L/yr - ₹22.2 L/yr |
Financial Analyst
254
salaries
| ₹2 L/yr - ₹10 L/yr |
Design Engineer
238
salaries
| ₹2.2 L/yr - ₹10.5 L/yr |
Finance Specialist
198
salaries
| ₹2.8 L/yr - ₹7.5 L/yr |
Thermax Limited
Isgec Heavy Engineering
Kirloskar Oil Engines
Kirloskar Brothers