Likes
First of all, after coming for the shift, I take relief from my reliever, after that I do TBT, after that I provide the locations to the man power and decide who has to go to which location. After that, I plan the Rake. Which rack is to be inserted into which connector and where is the material to be placedI have to stock, then I line up the route, after that, if there is any defect, I write it in the defect register and update it in the group and put the defect in the safe, a notification is issued to him, he should put the notification in his defect register. I write. If any problem arises during unloading, I resolve it.
read more