Likes
I am woking in stage 2 having 3 units, all 3 are capacity of 210mw, status is running from april 1979, july 1980, january 1981. I am br mechanical so i like work in this plant. I am tranee engineer to part of team in turbine maintance. I got to huge knolowldge in this section. Basically turbine has russian designed. Plus point it has to releted my branch so i also like to work in plant. Interest to working in section. I work with team on the regulating, filtering, overalling, lubricating , sealing system, maintaining auxillary of turbine.
read more