Assistant Manager

2500+ Assistant Manager Interview Questions and Answers

Updated 14 Dec 2024

Popular Companies

search-icon

Q51. Why cash is only put in vault not in frfc ?

Ans.

Cash is put in vault instead of FRFC due to security reasons.

  • Vault provides better security than FRFC

  • Vault is designed to store cash and other valuables

  • FRFC is used for depositing and withdrawing cash

  • Vault has additional security measures like cameras, alarms, and guards

  • FRFC is more accessible to customers and employees

  • Vault is usually located in a secure area with limited access

Q52. 3. When it comes to thermal power generation, what are the key challenges and considerations in terms of minimizing heat losses during the various stages of the power generation process? How do you ensure effic...

read more
Ans.

Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.

  • Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.

  • Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.

  • Efficient heat transfer can be achieved through the use of high-quality materials, proper sizing o...read more

Q53. What is process operations and unit operations. Distillation process. Previous plant troubleshooting. Previous contribution in process development and its improvement

Ans.

Process operations involve the overall management of a production process, while unit operations refer to specific processes within that production process. Distillation is a unit operation commonly used in chemical and petrochemical industries.

  • Process operations involve the coordination and management of all the different unit operations within a production process

  • Unit operations are specific processes within a production process, such as distillation, filtration, and mixing...read more

Q54. What is TMT steel? What is Fe 500 steel?

Ans.

TMT steel is a type of steel reinforcement used in construction. Fe 500 steel is a specific grade of TMT steel.

  • TMT stands for Thermo-Mechanically Treated steel

  • It is a type of steel reinforcement used in construction to provide strength and durability to concrete structures

  • Fe 500 steel is a specific grade of TMT steel that has a minimum yield strength of 500 N/mm²

  • Fe 500 steel is commonly used in high-rise buildings, bridges, and other critical structures

Are these interview questions helpful?

Q55. Cost of all operations in mining. Drilling, Blasting, loading, hauling, crushing, Royalty, Nmet, Dmft, Dozing etc How they will reduce.

Ans.

Cost reduction in mining operations through optimization and efficiency measures.

  • Implementing advanced technologies for drilling, blasting, and loading to reduce labor costs and increase efficiency.

  • Optimizing haul routes and using autonomous haulage systems to reduce fuel consumption and maintenance costs.

  • Improving crushing and grinding processes to reduce energy consumption and increase throughput.

  • Negotiating better royalty rates and exploring alternative sources of financin...read more

Q56. How do you work and How to handle customers in proffesional way ?

Ans.

I work with a customer-centric approach and handle them professionally by actively listening, empathizing, and providing solutions.

  • I prioritize customer satisfaction and ensure their needs are met.

  • I actively listen to their concerns and empathize with their situation.

  • I provide solutions that are tailored to their needs and offer alternatives if necessary.

  • I maintain a positive attitude and remain calm even in difficult situations.

  • I communicate clearly and effectively, ensuring...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q57. How it is different from other commercial banks.

Ans.

Our bank stands out with its customer-centric approach, innovative products, and advanced technology.

  • We prioritize customer satisfaction and tailor our services to meet their needs.

  • We offer unique products such as mobile banking and online investment platforms.

  • Our advanced technology allows for faster and more secure transactions.

  • We have a strong focus on financial education and offer resources to help customers make informed decisions.

  • Our bank has won several awards for our ...read more

Q58. Are you aware how to do heat load , BOQ preparation? what are the parameters you consider for BOQ preparation?

Ans.

Yes, I am aware of how to do heat load and BOQ preparation.

  • For heat load calculation, I consider factors like building size, insulation, number of occupants, and equipment usage.

  • For BOQ preparation, I consider materials needed, quantities required, labor costs, and any additional expenses.

  • I also take into account any special requirements or specifications provided by the client or project manager.

  • Examples: For heat load, I use software like Carrier HAP to calculate cooling lo...read more

Assistant Manager Jobs

Executive / Asst. Manager- InfoSec Compliance - Full Time WFO role 3-8 years
Ienergizer
4.7
Noida
Assistant Manager 2-5 years
BA Continuum India Pvt. Ltd.
4.3
Mumbai
Assistant Manager 3-4 years
BA Continuum India Pvt. Ltd.
4.3
Mumbai

Q59. What is your total Sales Target ? Break up in Lakhs and Number of ODU. What are the products you are handling?

Ans.

My total Sales Target is 50 Lakhs with 100 ODU. I handle products like electronics, home appliances, and furniture.

  • Total Sales Target: 50 Lakhs

  • Number of ODU: 100

  • Products handled: electronics, home appliances, furniture

Q60. What are the reasons of delay in a construction project?

Ans.

Delays in construction projects can be caused by various factors.

  • Weather conditions, such as heavy rain or extreme temperatures, can slow down construction progress.

  • Unforeseen site conditions, such as encountering unexpected underground utilities or poor soil quality, may require additional time for resolution.

  • Supply chain issues, including delays in material delivery or shortages, can impact project timelines.

  • Changes in project scope or design modifications can lead to delay...read more

Q61. How many carpenters are required for 3000cum concreting

Ans.

The number of carpenters required for 3000cum concreting depends on the size of the project and the speed of the carpenters.

  • The size of the project and the speed of the carpenters are important factors in determining the number of carpenters required.

  • The type of formwork being used can also affect the number of carpenters needed.

  • On average, one carpenter can complete 4-5 cubic meters of formwork per day.

  • Assuming an average of 4.5 cubic meters per day per carpenter, 3000 cubic...read more

Q62. • Where I’m responsible for B2B & B2C order fulfilment & dispatch. • Ensuring all the daily compliance & targets of the dept. are met within TAT. • Manpower planning & tasks assigning to the team based on targe...

read more
Ans.

I am responsible for B2B & B2C order fulfilment & dispatch, ensuring compliance & targets are met, and managing the team.

  • Responsible for B2B & B2C order fulfilment & dispatch

  • Ensure daily compliance & targets are met within TAT

  • Manage manpower planning & tasks assigning to the team based on targets

  • Monitor Order Fulfilment operations, Packing & dispatch

  • Ensure high quality customer service to achieve high customer satisfaction

  • Monitor Customer return restocking team with proper SO...read more

Q63. How we can improve the landing page give me 5 reason

Ans.

Improving the landing page can increase user engagement and conversions.

  • Simplify the design and layout

  • Use clear and concise messaging

  • Include high-quality visuals and videos

  • Add social proof and customer testimonials

  • Optimize for mobile devices

Q64. What is the travel speed of Gantry in horizontal and vertical?

Ans.

The travel speed of Gantry in horizontal and vertical depends on the specific model and manufacturer.

  • The travel speed can range from 100 to 500 feet per minute depending on the model.

  • The vertical speed can range from 50 to 200 feet per minute depending on the model.

  • Some examples of gantry models and their speeds are: XYZ gantry with a horizontal speed of 300 feet per minute and a vertical speed of 100 feet per minute, and ABC gantry with a horizontal speed of 200 feet per min...read more

Q65. concrete properties during concreting how to to check?

Ans.

To check concrete properties during concreting, various methods can be used.

  • Check the slump of the concrete to ensure it has the desired consistency

  • Monitor the temperature of the concrete to prevent excessive heat or cold

  • Use a moisture meter to ensure the concrete is not too wet or dry

  • Check the air content of the concrete to ensure it meets specifications

  • Perform compressive strength tests on samples of the concrete to ensure it meets strength requirements

Q66. What is Contract What is agreement how to reply the public grievence in our favour how to resolve users issues at the toll plaza proceedure about the arbitration any case hand by individually and any order achi...

read more
Ans.

Answering questions related to contracts, agreements, public grievances, toll plaza issues, arbitration, previous company, and expectations from the organization.

  • A contract is a legally binding agreement between two or more parties.

  • An agreement is a mutual understanding between two or more parties.

  • To reply to public grievances in our favor, we need to understand the issue and provide a satisfactory solution.

  • To resolve user issues at the toll plaza, we need to have a customer ...read more

Q67. How many types of ROAD IN rmc plant for TM movement

Ans.

There are typically two types of roads in an RMC plant for TM movement: internal roads and access roads.

  • Internal roads are used for transporting materials within the plant premises.

  • Access roads are used for entering and exiting the plant.

  • Proper road infrastructure is essential for smooth movement of transit mixers.

  • Examples: concrete internal roads, paved access roads.

Q68. Varieties of Material standards ( Iso, Din, Asme) regarding plates, fasteners, shaft, wheel, key & all. Every possible questions related to my projects with SOM basic engineering qs like stess, strain, Load, Ma...

read more
Ans.

Varieties of material standards for plates, fasteners, shafts, wheels, keys, and more in engineering projects.

  • Different material standards like ISO, DIN, ASME have specific requirements for various components.

  • Understanding stress, strain, load, material properties, stress-strain curves is essential for engineering projects.

  • Knowledge of manufacturing concepts like GD&T, limit fit tolerance is important.

  • Experience with software like Creo 8.0 is beneficial for design and analysi...read more

Q69. 1. Whats subjects you have been taught. 2. Whats your fab subject. 3. Can you tell about electrical machine. 4. Whats a transformer 5. How does induction motor work. 6. How power is generated. 7. Type of transf...

read more
Ans.

Interview questions for Assistant Manager position in electrical engineering field.

  • Subjects taught: Electrical machines, Control systems, Power systems, etc.

  • Favorite subject: Control systems

  • Electrical machine: A device that converts electrical energy into mechanical energy or vice versa

  • Transformer: A device that transfers electrical energy from one circuit to another through electromagnetic induction

  • Induction motor: A type of AC motor where the rotor rotates due to electromag...read more

Q70. How do you calculate the cement and sand for 1 sqm cm 1:4?

Ans.

To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

  • The ratio of cement to sand is 1:4

  • Calculate the total volume of the mixture, which is 1 sqm cm

  • Divide the total volume by the sum of the ratio (1+4=5)

  • Multiply the quotient by the individual ratio to get the volume of cement and sand

  • Convert the volume to weight using the density of cement and sand

Q71. What are the territories you have handled? who are the major dealers ?and what is the business contribution?

Ans.

I have handled territories in the Midwest region, major dealers include ABC Company and XYZ Inc., and have contributed to a 20% increase in business.

  • Handled territories in the Midwest region

  • Major dealers include ABC Company and XYZ Inc.

  • Contributed to a 20% increase in business

Q72. How do you find the reagent addition rate for exothermic reaction?

Ans.

The reagent addition rate for exothermic reaction can be found by monitoring the temperature and adjusting the rate accordingly.

  • Start with a small addition rate and gradually increase it while monitoring the temperature.

  • Use a thermometer or temperature sensor to measure the temperature.

  • Adjust the rate based on the temperature changes to maintain a steady reaction rate.

  • Consider the reaction kinetics and the heat transfer properties of the system.

  • Examples: Continuous stirred ta...read more

Q73. What is soiled and mutilated notes ?

Ans.

Soiled and mutilated notes are damaged or defaced currency that is no longer in a usable condition.

  • Soiled notes refer to currency that has become dirty, stained, or discolored due to various factors such as handling, exposure to moisture, or environmental conditions.

  • Mutilated notes are currency that has been damaged or altered in a way that renders it unfit for circulation. This can include torn, burnt, or partially destroyed notes.

  • Soiled and mutilated notes are typically wit...read more

Q74. 1 ton steel work how much quantity of binding wire required?

Ans.

The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.

  • The type of binding wire used can vary, such as galvanized or black annealed wire.

  • The thickness of the steel bars also affects the quantity of binding wire required.

  • The binding technique, whether it is single or double binding, will determine the amount of wire needed.

  • To determine the exact q...read more

Q75. How much of insurance have you sold in past year and month on month basis

Ans.

I don't have the available data

    Q76. Secondary side current calculations for transformer and DG

    Ans.

    Secondary side current calculations involve determining the current flowing through the transformer and DG.

    • Calculate the load current on the secondary side of the transformer using the formula I2 = (I1 * V1) / V2

    • Calculate the current output of the DG using the formula I = P / V

    • Consider factors such as power factor and efficiency in the calculations

    • Ensure that the current ratings of the transformer and DG are not exceeded

    Q77. What is accrual account and Journal entry ?

    Ans.

    Accrual account is a type of account that records revenue or expenses that have been earned or incurred but not yet received or paid.

    • Accrual accounting recognizes revenue and expenses when they are earned or incurred, regardless of when the cash is received or paid.

    • Accrual accounts are used to record these transactions until they are paid or received.

    • Journal entry is the process of recording a transaction in the accounting system using debits and credits.

    • For example, if a com...read more

    Q78. Which operating system do you know? Like SAP or any others?

    Ans.

    I am familiar with multiple operating systems including SAP, Windows, and macOS.

    • I have experience working with SAP, a widely used enterprise resource planning software.

    • I am proficient in using Windows operating system and its various versions.

    • I am also familiar with macOS and its functionalities.

    • I have basic knowledge of Linux and its command line interface.

    Q79. Brief discussion of ourself How to retain customer How to face frustrated customer How to analyse danger zone What are the priorities for problem solution What is floor Management What is Inventory How to contr...

    read more
    Ans.

    As an Assistant Manager, I prioritize customer satisfaction, analyze danger zones, manage inventory, ensure food safety, and plan shifts effectively.

    • To retain customers, I focus on providing excellent service and addressing their concerns promptly.

    • When facing a frustrated customer, I remain calm, listen actively, and offer solutions to their problems.

    • To analyze danger zones, I identify potential risks and take proactive measures to prevent accidents or incidents.

    • Priorities fo...read more

    Q80. What is CounterFiet Currency Report ? What should we do ,when we find out CF Note.

    Ans.

    Counterfeit Currency Report is a document that lists all the counterfeit currency detected by a business or organization.

    • Immediately notify the authorities and hand over the counterfeit note.

    • Record the details of the person who gave the note, if possible.

    • Train employees to identify counterfeit notes.

    • Regularly update the Counterfeit Currency Report.

    • Destroy the counterfeit note to prevent it from re-entering circulation.

    Q81. 100 % CPT achievement. • Managed vendor returns. • Managing a team of 100-200 employees in a shift. • Managing inbound and outbound processing. • Arranging transport for line haul operation, vehicle mapping. • ...

    read more
    Ans.

    I have achieved 100% CPT and managed various aspects of warehouse operations including team management, KPIs, and transport arrangements.

    • Achieved 100% CPT and managed vendor returns

    • Managed a team of 100-200 employees in a shift

    • Managed inbound and outbound processing

    • Arranged transport for line haul operation and vehicle mapping

    • Responsible for completing key KPIs such as inbound, outbound, cost reduction, inventory accuracy, warehouse efficiency, and productivity

    • Responsible for...read more

    Q82. How can you add value to the brand of Aparna Constructions as a sales person and how diverse is your experience as a whole ?

    Ans.

    As a sales person, I can add value to Aparna Constructions by utilizing my diverse experience in sales and marketing.

    • I have experience in developing and implementing successful sales strategies.

    • I can leverage my network and relationships to generate leads and increase sales.

    • I have a track record of exceeding sales targets and delivering results.

    • I am skilled in customer relationship management and can ensure customer satisfaction.

    • My experience in marketing can help in promotin...read more

    Q83. What is difference between process builder and workflow rule.

    Ans.

    Process Builder is a more advanced automation tool compared to Workflow Rule.

    • Process Builder allows for more complex logic and can perform multiple actions.

    • Workflow Rule is limited to simple if/then logic and can only perform field updates or send email alerts.

    • Process Builder can create or update records, launch flows, and call Apex classes.

    • Workflow Rule can only trigger on record creation or when specific field values are changed.

    • Process Builder has a visual interface for ea...read more

    Q84. What is OTDR & it's components & principal

    Ans.

    OTDR is a device used to test fiber optic cables. It measures the time and strength of light signals sent through the cable.

    • OTDR stands for Optical Time Domain Reflectometer

    • It sends a pulse of light into the fiber and measures the time and strength of the reflected signal

    • Components include a laser, detector, and display screen

    • It can detect faults in the cable such as breaks, bends, and splices

    • It is commonly used in the telecommunications industry for maintenance and troublesh...read more

    Q85. What is the pressure of CPVC pipe when testing the water test?

    Ans.

    The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.

    • The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).

    • The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.

    • Industry standards, such as ASTM D1785 for CPVC pipes, provide guidelines for the pressure ratings of CPVC pipes.

    • For exa...read more

    Q86. 1.Currently what are you doing ? 2.what is operations 3.what is banking 4.what is kyc 5.are you ready to relocate

    Ans.

    Answering questions related to current job, operations, banking, KYC and relocation.

    • Currently working as a customer service representative at XYZ Bank

    • Operations refer to the day-to-day activities of a business or organization

    • Banking is the business activity of accepting and safeguarding money owned by other individuals and entities

    • KYC stands for Know Your Customer, it is a process of verifying the identity of a customer

    • Yes, I am ready to relocate for the right opportunity

    Q87. Draw the shown object in different views?

    Ans.

    The question asks the candidate to draw an object in different views.

    • The candidate should understand the concept of different views, such as top view, front view, and side view.

    • They should be able to accurately represent the object in each view, considering its dimensions and proportions.

    • The candidate may need to use their spatial visualization skills to visualize the object from different perspectives.

    • They should be able to communicate their drawings effectively, using clear...read more

    Q88. Please explain briefly the step wise process of fabrication and erection of a storage tank as per standard API code.

    Ans.

    The fabrication and erection of a storage tank as per API code involves several steps.

    • The tank design is finalized based on the intended use and specifications.

    • The materials for the tank are selected and procured.

    • The plates are cut and rolled to form the shell and heads of the tank.

    • The shell and heads are welded together to form the tank.

    • The tank is hydrotested to ensure it can withstand the intended pressure.

    • The tank is sandblasted and painted to protect against corrosion.

    • Th...read more

    Q89. What is biggest issue faced by the banks?

    Ans.

    The biggest issue faced by banks is managing risk and maintaining financial stability.

    • Banks need to balance risk and reward while ensuring financial stability

    • Regulatory compliance is a major challenge for banks

    • Cybersecurity threats are increasing and banks need to invest in security measures

    • Low interest rates and economic uncertainty can impact profitability

    • Customer expectations are changing and banks need to adapt to new technologies and services

    Q90. How to control shrinkage in retail store give me three answer

    Ans.

    To control shrinkage in a retail store, implement strict inventory management, enhance security measures, and train employees on loss prevention.

    • Implement strict inventory management practices such as regular stock counts and audits

    • Enhance security measures by installing surveillance cameras, alarm systems, and anti-theft devices

    • Train employees on loss prevention techniques like proper cash handling, identifying shoplifting behaviors, and reporting suspicious activities

    Q91. Q4. To give you a plastic part, & you have to analyse on what machine it will run & it's tool cost.

    Ans.

    To determine the machine and tool cost for a plastic part.

    • Analyze the dimensions and material of the plastic part

    • Identify the required tolerances and surface finish

    • Consider the production volume and lead time

    • Research the available machines and their capabilities

    • Calculate the tooling cost based on the chosen machine

    • Consider the maintenance and operating costs of the machine

    Q92. What are all the software's that you've learnt in your academics ?

    Ans.

    I have learned various software's including Microsoft Office, MATLAB, and Adobe Creative Suite.

    • Proficient in Microsoft Office including Word, Excel, and PowerPoint

    • Experience with MATLAB for data analysis and modeling

    • Familiarity with Adobe Creative Suite including Photoshop and InDesign

    • Basic knowledge of programming languages such as Java and Python

    Q93. What are the basic docs required for individual and non individual

    Ans.

    The basic documents required for individuals and non-individuals vary depending on the purpose and context.

    • For individuals, basic documents may include identification proof (such as passport or driver's license), address proof (such as utility bills or bank statements), and income proof (such as salary slips or tax returns).

    • For non-individuals, basic documents may include registration documents (such as certificate of incorporation or partnership deed), identity proof of auth...read more

    Q94. What is your in hand Salary ? what is fixed component & variable into CTC?

    Ans.

    My in hand salary is the amount I receive after deductions. The fixed component of my CTC is the guaranteed portion of my salary, while the variable component depends on performance.

    • In hand salary is the amount received after deductions such as taxes and other withholdings.

    • Fixed component of CTC is the guaranteed portion of salary, such as base salary.

    • Variable component of CTC is the portion that can vary based on performance, bonuses, incentives, etc.

    Q95. How many days will be taken in construction of an underground rcc water tank of 5x5 x2 m

    Ans.

    The construction of an underground RCC water tank of 5x5x2m can take approximately 30-45 days.

    • The time taken for construction can vary based on factors like soil conditions, weather, availability of materials, and workforce.

    • On average, it may take 1-2 weeks for excavation and foundation work, 2-3 weeks for formwork and reinforcement, and 1-2 weeks for pouring and curing of concrete.

    • Delays in construction due to unforeseen circumstances like bad weather or shortage of material...read more

    Q96. Explain how you test a change management control when the application doesn't store the updates log.

    Ans.

    Testing change management control without update log

    • Create a test environment to simulate the change

    • Document the change and expected outcome

    • Perform the change and observe the system behavior

    • Compare the system behavior with the expected outcome

    • Repeat the process with different scenarios

    • Use version control to track changes

    Q97. Tell us the journey of IDBI from RBI.

    Ans.

    IDBI was established in 1964 as a subsidiary of RBI and later became an independent entity in 2004.

    • IDBI was established in 1964 as a subsidiary of RBI to provide credit and other facilities for the development of industries in India.

    • In 1976, IDBI was made the principal financial institution for coordinating the activities of institutions engaged in financing, promoting and developing industry in India.

    • In 2004, IDBI became an independent entity after the RBI sold its entire st...read more

    Q98. What is the specification limit for known impurities and unknown impurities and which guideline explains

    Ans.

    The specification limit for known and unknown impurities varies depending on the specific substance being tested.

    • The specification limit for known impurities is typically set by regulatory agencies or pharmacopoeias.

    • For example, the United States Pharmacopeia (USP) sets limits for known impurities in pharmaceutical substances.

    • The specification limit for unknown impurities is usually determined through method validation studies.

    • These studies involve analyzing samples of the su...read more

    Q99. What do you know about electronics card and protection?

    Ans.

    Electronics card protection refers to measures taken to safeguard electronic components from damage or malfunction.

    • Electronics card protection involves protecting electronic components from environmental factors such as moisture, dust, and temperature fluctuations.

    • This can be achieved through the use of protective coatings, enclosures, and proper ventilation.

    • Protection can also involve measures to prevent damage from electrostatic discharge (ESD) and power surges.

    • Examples of ...read more

    Q100. What is APQP & PPAP / Types of material used for tool and lead time for tool development / painting knowledge .

    Ans.

    APQP & PPAP are quality management systems used in automotive industry. Tool material varies based on application. Painting knowledge is essential.

    • APQP (Advanced Product Quality Planning) & PPAP (Production Part Approval Process) are quality management systems used in automotive industry

    • Tool material varies based on application. For example, high-speed steel is used for cutting tools, while carbide is used for milling tools

    • Lead time for tool development depends on the complex...read more

    Previous
    1
    2
    3
    4
    5
    6
    7
    Next
    Interview Tips & Stories
    Ace your next interview with expert advice and inspiring stories

    Interview experiences of popular companies

    3.9
     • 2.9k Interviews
    3.8
     • 2.8k Interviews
    4.0
     • 2.4k Interviews
    3.9
     • 2k Interviews
    3.9
     • 1.6k Interviews
    3.9
     • 1.5k Interviews
    3.8
     • 1.4k Interviews
    3.8
     • 505 Interviews
    View all

    Calculate your in-hand salary

    Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

    Assistant Manager Interview Questions
    Share an Interview
    Stay ahead in your career. Get AmbitionBox app
    qr-code
    Helping over 1 Crore job seekers every month in choosing their right fit company
    65 L+

    Reviews

    4 L+

    Interviews

    4 Cr+

    Salaries

    1 Cr+

    Users/Month

    Contribute to help millions
    Get AmbitionBox app

    Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

    Follow us
    • Youtube
    • Instagram
    • LinkedIn
    • Facebook
    • Twitter