5 Technomech Oil & Energy Jobs
Civil Construction Engineer
Technomech Oil & Energy
posted 6mon ago
Key skills for the job
SPECIFIC
Outlining, leveling as well as surveying the site.
Preparation of formwork program for the entire scope, finalise shuttering scheme and ensure effective utilisation of shuttering and staging material.
Planning and allocating material/labor/ P&M for RCC activities and ensuring that the substructure and superstructure progress is as per the project master plan.
Organizing as well as advising entry-level or trainee engineers.
Daily administration of the allocated site, comprising supervision as well as observing the site workforce as well as the work of some sub-contractors.
Develop scaffolding plans and direction
Control and direct the carpenters, laborers and ironworks
Develop estimates as required to support work
Execute all structural members such as footings, pedestals, columns, plinth beams etc., as per drawings
Checking the positions of the members, reinforcement details such as dia spacing numbers, lapping, position, starter bars cover, anchorage etc., as per drawings.
Checking out the formwork dimensions, alignment, plumb, gaps, stability etc., as per drawings.
Taking approvals for slab casting from PMC after checking all requirements for reinforcement for beams, slabs such as dimensions dia of bars, lapping, negatives, positives and shear reinforcement, stirrup spacings, crank length extra bars etc., as per drawings.
Conducting post pore inspections and monitoring repairs to RCC Works.
Avoid the leakage control to the sunken slabs.
Checking the Architectural works such as brick masonry after checking first course, internal and external plastering after put level pegs for alignment, plumb and appropriate dimensions for openings.
Checking out the workmanship after plastering such as alignment plumb, corner angels, general surface condition curing etc., point out the defect and get them rectified.
Taking the cube results of the mix cubes after 7 days & 28 days curing and record the results.
Checking the quality of materials such as, bricks, course aggregate, fine aggregate and approve them as they satisfy the requirements.
Fixing up the targets to the subcons and monitoring as per that
GENERAL
Manage direct hire personnel and subcontractors' adherence to the plans and specifications all relevant project plans, including the Project Health and Safety Plan
Verify plans, designs/drawings, and quantities for accurate computations.
Manage direct hire personnel and subcontractors adherence to the plans and specifications all relevant project plans including the Project Health and Safety Plan
Verifying plans, designs/drawings as well as quantities for accurateness of computations.
Making sure that the entire materials utilized as well as work conducted is according to provisions.
Supervising the assortment as well as requirement of materials as well as plant.
Solving technical problems with organizations representatives, providers, sub-contractors as well as relevant authorities.
Monitoring the quality as per IS/procedures business plans, security plans as well as review and trial programs, the entire made by the project administration team as well as by sub-contractors.
Organizing the work as well as effectively managing the plant as well as site facilities so as to fulfill set time limits.
Supervising quality inspection as well as safety and health concernsat site;
Making reports as needed.
Solving any unanticipated technical problems as well as additional issues that could occur.
Work with Project Controls personnel to understand and produce 30, 60, 90 day look ahead schedule of future activities that will complete the project on time
Advise senior level superintendents and/or project management of potential problems, work interferences, schedule difficulties, Assist in resolving such problems as required
Evaluate contractor performance
With the involvement of your general foremen/foremen, develop and maintain a plan and schedule of work based on the project master plan
Oversight and coordination of subcontractor activities for an operational industrial facility performing renovations, and build outs on existing structures on Greenfield projects
Control and direct the carpenter, laborers, and ironworkers
Maintaining Productivity Logs. Prepare and send Daily Work progress report, Quality reports with Pics to Line Manager
Completing all necessary Q.A. documentation related to the work under his direct control and co-ordinate daily site inspections
Completely responsible for ensuring Method statements are followed.
Employment Type: Full Time, Temporary/Contractual
Functional Areas: Other
Read full job description